Forum quick links
5% minimum area
EBOM-2009 WEc3:Water Efficient Landscapingposted by Meryl Corsun on
Hello, Our project site is in an urban location with a small landscaped area (about 4%).
Is Athena Impact Estimator Suitable for this Pilot Credit?
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by MURAT DOĞRU on
Are Athena Impact Estimator is suitable for this pilot credit. Your sincerely, Murat
Firestopping sealant
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Joseph Greene on
We are reviewing a submittal for a firestopping product with a two part application. Part 1 is trowel-applied and Part 2 is sprayed on. What category does this fall under in IEQ 4.1?
Mechanically Ventilated Areas
CS-2009 IEQp1:Minimum IAQ Performanceposted by Angela Saggin on
Hi! I’m working on a residential building pre-certified and the project has some areas naturally ventilated and others mechanically ventilated.
Using Rainwater for Cooling Tower Make-up
EBOM-2009 WEc4:Cooling Tower Water Managementposted by Kevin Krejci on
Thinking of doing a feasability study on using rainwater from garage run-off for cooling tower make-up. Has anyone been down this road and is willing to share challenges / successes?
LEED EBOM - Villas hotel
posted by Roberto Meza on
Hello, Is it possible to certify under EBOM an eco-hotel that is comprised by separate villas? Thanks.
Lake Resort - AGMBC for EBOM & NC?
posted by David Mirabile on
We are in the preliminary phases of a design for a lake resort property.
FTE
posted by John Glennon on
I am working on a FedEX building where the delivery staff are in the building for an hour or less in the morning and about the same in the afternoon. How do I calculate these?
Calculating Shaded Area for SS Pr 7.1- Variance for SRI Values
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Melissa Decatur on
Two questions: Is partial credit or a variance given for SRI values lower than 29 to comply with SS Pr 7.1? Also, can anyone give me feedback on how they calculated the Shaded area on Site for Ve
Treatment of District or Campus Thermal Energy in LEED 2009
posted by Henry Mak on
hi, we are working on a project which consists of 5 buildings and only 2 of them will go for LEED certification. AGMBC approach has been applied.