LEED Guidance for Campuses and Multiple Buildings
posted by  Tarek Dalati  on 

my project is composed of a 52 residential building and 2 retails (g+1 and G+2) they are in the same project boundary and fed from the same HVAC systems ( chillers and boilers) the retails are bas

0

Salvaged granite block

NC-2009 MRc3:Materials Reuse
posted by  Sara Sweeney  on 

Hi I am working on a project where 83.75 tons of granite slabs were removed from a site during site clean-up for the new bilding being built.

1
Mon Jun 11, 2012, 4:12 pm

Private Lav Faucets - Baseline vs. Metered Design

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Vincent Pieri  on 

We are working on a single floor, single tenant project with several fixture group assignments.

1
Wed Sep 5, 2012, 10:46 pm

multiple buildings energy modeling

NC-2009 EAp2:Minimum Energy Performance
posted by  Tarek Dalati  on 

My project consist of a mixed used tower (G+52 floors) and 2 detached building ( be fed from the same cooling and heating system ) but they are core and shell and I m persuing LEED NC 2009 honestly

1
Mon Jun 11, 2012, 1:22 pm

Deadline for project submission

General forums
posted by  Peggy Brock  on 

Project deadlines are found in the Certification Policies Manual starting on page 16 and rating system specific deadlines are in the appendices starting on page 31.

0

Refrigerators

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  Rebecca Nelson  on 

I want to be able to supply to LEED certified buildings and customers. To apply towards a LEED credit, do refrigerators and refrigerator-freezers only need to meet EnergyStar requirements?

1
Fri Jun 22, 2012, 4:11 pm

Defining "One Building"

General forums
posted by  Chris DeVolder  on 

I'm curious how others would interpret MRP 2 Must be a Complete Building or Space as it relates to an outdoor sports facility. The facility has a series of 'buildings' that are connected (some cont

0

New LEED CI SScr3

CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Kevin Wilcox  on 

I recently completed a LEED CI project and submitting for review and just started a new LEED CI project under LEED CI v2009 and found a significant change to the SS credit 3 category.

1
Tue Jun 19, 2012, 11:08 pm

9.4.1.2 (Space Control)

NC-2009 EAp2:Minimum Energy Performance
posted by  Carolina Vergnano  on 

In the item 9.4.1.2 (Space Control) of ASHRAE 90.1-2007, it is not clear if the lights of the classrooms/conference/meeting/break rooms have to be controlled only by occupancy sensors controls.

1
Mon Jun 11, 2012, 7:29 pm

We are working on a stadium

NC-2009 EAp2:Minimum Energy Performance
posted by  Carolina Vergnano  on 

We are working on a stadium Project, where the item 9.4.1.1 (Automatic Lighting Shutoff) of ASHRAE 90.1-2007 is being complied for most of the areas, which represents more than 90% of the project a

1
Mon Jun 11, 2012, 7:46 pm