LEED-CI Cx after occupancy?

CI-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Leticia SooHoo  on 

I am working on a proposal for a LEED-CI project.

1
Thu Jul 5, 2012, 2:53 pm

Is this a pause or rewrite?

General forums
posted by  Bill Swanson  on 

Wow, Rob's still got influence. He even got them to change the name to v4.

1
Tue Jun 5, 2012, 3:50 pm

Baseline Fan Power: Systems 6 and 8 ASHRAE 90.1-2007 Appendix G

NC-2009 EAp2:Minimum Energy Performance
posted by  TOMAS URIBE  on 

If our Baseline building design HVAC system is ASHRAE’s #6 or #8 (according to TABLE G3.1.1B).

1
Thu Jun 7, 2012, 9:45 pm

Inert post-installation materials

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Andrew Gil  on 

I am remembering hearing of an addendum, errata or CIR, clarifying that materials that undergo a chemical reaction DURING installation (e.g.

0

Plastics/PVC and Flooring

EBOM-2009 MRc9:Solid Waste Management—Facility Alterations and Additions
posted by  Kim Wajda  on 

Neither are mentioned in the Solid Waste Conversion Factors table in the EB O&M manual so I calculated their conversions from pounds to cubic yards using the given density for "Mixed waste".

1
Mon Sep 3, 2012, 10:40 pm

Basis for Individual Controls Count

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  Terry Gorski  on 

For the individually occupied spaces in a typical office building, how close to the FTE occupant number being used in PI Form 3 does the total building occupant number being used for this credit ne

1
Wed Jun 6, 2012, 6:59 pm

Thoughts about this pilot credit

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Todd Henderson  on 

We're attempting this pilot credit on a hospital here in San Francisco, California. I have some thoughts about the building facade requirements that I'm curious if anyone has also encountered. 1.

0

About Power Meter calibration report required in EAp2

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  NGUYEN THUY  on 

Our performance period start from May to July, but we just can calib the power monitors in next shutdown in August.

1
Fri Oct 5, 2012, 3:57 pm

Tenants scope of responsibility in Core and Shell certification

CS-2009 SSc9:Tenant Design and Construction Guidelines
posted by  Yong Lee Low  on 

We understand that the tenant guidelines are just recommendations and not requirements. And the items that the owner would want to enforce will be included in the legal tenant and lease agreement.

1
Wed Jun 27, 2012, 1:07 pm

Is soil a material considered on this credit?

NC-2009 MRc3:Materials Reuse
posted by  Albert Sagrera  on 

Would you consider the reuse of soil on this credit? The situacion is that the soil extracted for the building construction is not send to dump but it's reused on the modeling of landscape.

1