Forum quick links
LEED-CI Cx after occupancy?
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Leticia SooHoo on
I am working on a proposal for a LEED-CI project.
Is this a pause or rewrite?
posted by Bill Swanson on
Wow, Rob's still got influence. He even got them to change the name to v4.
Baseline Fan Power: Systems 6 and 8 ASHRAE 90.1-2007 Appendix G
NC-2009 EAp2:Minimum Energy Performanceposted by TOMAS URIBE on
If our Baseline building design HVAC system is ASHRAE’s #6 or #8 (according to TABLE G3.1.1B).
Inert post-installation materials
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Andrew Gil on
I am remembering hearing of an addendum, errata or CIR, clarifying that materials that undergo a chemical reaction DURING installation (e.g.
Plastics/PVC and Flooring
EBOM-2009 MRc9:Solid Waste Management—Facility Alterations and Additionsposted by Kim Wajda on
Neither are mentioned in the Solid Waste Conversion Factors table in the EB O&M manual so I calculated their conversions from pounds to cubic yards using the given density for "Mixed waste".
Basis for Individual Controls Count
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Terry Gorski on
For the individually occupied spaces in a typical office building, how close to the FTE occupant number being used in PI Form 3 does the total building occupant number being used for this credit ne
Thoughts about this pilot credit
Pilot-Credits SSpc55:Bird collision deterrenceposted by Todd Henderson on
We're attempting this pilot credit on a hospital here in San Francisco, California. I have some thoughts about the building facade requirements that I'm curious if anyone has also encountered. 1.
About Power Meter calibration report required in EAp2
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by NGUYEN THUY on
Our performance period start from May to July, but we just can calib the power monitors in next shutdown in August.
Tenants scope of responsibility in Core and Shell certification
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Yong Lee Low on
We understand that the tenant guidelines are just recommendations and not requirements. And the items that the owner would want to enforce will be included in the legal tenant and lease agreement.
Is soil a material considered on this credit?
NC-2009 MRc3:Materials Reuseposted by Albert Sagrera on
Would you consider the reuse of soil on this credit? The situacion is that the soil extracted for the building construction is not send to dump but it's reused on the modeling of landscape.