Forum quick links
Project Scorecard Status
posted by James Keohane on
The results of pushing "Print Score Card" button does not include the status check marks. Anyway you can add status check marks( green when complete and grey when otherwise)?
MRc7 New wood %
CI-2009 MRc7:Certified Woodposted by Judy Chin on
I rec'd an invoice for a wood product stating that the product is FSC Mixed Credit, LEED Online is asking for new wood % for this product.Supplier can not provide me with % info, what should i do.
Green Power Purchasing
CS-2009 EAc6:Green Powerposted by Jesus Deras on
When purchasing Green Power for commercial interior fit outs/Floor via the SF methodology, do you typically take the area of the entire space(including ac rooms, freight elevators, stairs,electrica
Low Mercury Lighting Systems?
Schools-2009 IDc1:Innovation in Designposted by Michael Kros on
I've heard that under LEED v2.2 (and maybe under version 3.0 as well), you could achieve an ID Credit for installing low mercury lighting systems.
Minimum % Reduction for Historical Data - Case 2?
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Kimberly Frith on
We see there are EAc1 points associated with reducing energy consumption as compared to historical building energy usage data for Case 2 projects that can't earn the Energy Star label, but it's unc
Reference Guide E-Books need to be editable or updated by USGBC
posted by RETIRED on
Chrissy – Thanks for participating in this forum.
retaining LEED certification
posted by Tristan Roberts on
Alexandra, perhaps someone else on the forum can dig this information out of a GBCI policy document somewhere, but a LEED-NC certification is permanent (in contrast with LEED-EBOM).
OATEY CLEAR PRIMER
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Judy Chin on
Do you know if the product is compliant with SCAQMD. On the MSDS, it states VOC Level:600 g/l per SCAQMD Test Method 316A. I thought the VOC allow was 510 or 550. thx
Conference Call with Review Team prior to submittal
posted by Alison Y Rivenburgh on
Is it possible to schedule a conference call with the GBCI review team to discuss project-specific issues prior to submitting the documentation for review?
Tying review comments to date of project registration
posted by Alison Y Rivenburgh on
What mechanism is in place to ensure that review comments are based on the requirements that were in place at the time of registration?