Forum quick links
Innovation Credit for Materials manufactured only within 500 mil
NC-2009 IDc1:Innovation in Designposted by Faith Wilbert on
I was wondering if anyone has ever tried to get an innovation credit for having certain percentage of materials being manufactured within 500 miles.
Air Sealing between demising walls in Mid-rise
posted by Ian Johnson on
We have a project where the the demising walls go all the way to the underside of the floor trusses and the ceiling drywall is attached to the bottom chord of the floor trusses.
Waste Water Calculation for Option 2
NC-2009 WEc2:Innovative Wastewater Technologiesposted by sompoche sirichote on
LEED template use the flush fixture water which calculated based on occupant usage.
"required" metered systems
NC-2009 EAc5:Measurement and Verificationposted by Florian Schmidtchen on
On this webpage in EAc5, I read that there are "Commonly metered systems", including lighting , motors, HVAC loads etc.
Project on Military base (or campus)...help
posted by Justin Sack on
We have a project on a military base that must achieve LEED Silver and we are off to a rocky start with the recent return of our design credit submission.
lease agreement for residential units
CS-2009 IEQp1:Minimum IAQ Performanceposted by Carolina Vergnano on
We are working on a CS muti-unit residential project. There will be infrastructure for residents to use splits in their units.
District Cooling - Free Cooling
CS-2009 EAc4:Enhanced Refrigerant Managementposted by Johannes Gellrich on
Dear all, Our building is supplied with cold water from a DES.
Discovery of Streetlights, changes Energy Performance
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Janna Nash on
I am not sure how to approach a recent discovery.
Minimum tenant Agreement Specs for Core and Shell
CS-2009 WEp1:Water Use Reductionposted by Lawrence Lile on
What would be the absolute minimum that a LEED CS tenant agreement would have to specify to get some level of LEED certification?
Thermosetting Plastic Flooring
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Tanja Arnesson on
A question regarding Thermosetting plastic flooring, how and when do we measure the VOC content? In the different components or in the whole product.