Forum quick links
3rd Comment Period Extended to March 27
posted by Tristan Roberts on
LEEDuser has gotten word that USGBC has extende the third public comment period for LEED 2012 to March 27th. So, keep on commenting!
Construction Demolition Waste credit
posted by Jennifer Frey on
Has anyone else checked the math on the MR Construction Demolition Waste credit?
Air Pollution Prevention
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Ellen Mitchell on
This week I have had two projects returned to me from the preliminary construction review with the same comment. I have never seen this comment before and am a little perplexed.
EQ Credit: Acoustic Performance - Sound System Portion
posted by Joseph F. Bridger on
I corresponded with our audio designers (Fred/Richard) and here is a summary of their comments. Since I submitted my comment already, I was not able to add their thoughts to the public comment.
Heat Island Reduction
posted by Chris Munn on
There appears to be four options worth a total of two points.
Water Metering- Submetering- EB O&M
posted by Chris Munn on
This credit is worth 2 points. According to the draft, you get 2 points for having two or more subsystems submetered, however if you only have one subsystem submetered, you get 0 points.
Retrocommissioning Investigation and Analysis
posted by Chris Munn on
According to the draft, it appears that the commissioning investigation credit now requires both a Level II Audit and commissioning, as opposed to one or the other like the previous version.
Enhanced IAQ Strategies- EB O&M
posted by Chris Munn on
Based on the way this credit appears in the draft, you get one point for having the 10 feet of matting, and then an additional point if you have either 1) MERV-13 filtration in place, 2) Carbon Dio
Parking Lot Coatings
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Charles Fritzemeier on
Where do parking lot coatings come in?
No Green-e certification available
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Sustainability Provider on
Hello, Our building is pursuing for LEED EBOM 2009 vertification and we procure all of our electricity (no natural gas or other fuel type is consumed in our building) from a renewable energy provid