Forum quick links
The ITE Parking Generation
posted by Nelina Loiselle on
The ITE Parking Generation Study refferences school population for units in determing # of parking spaces for University/college buildings.
Details - Clarification of Headings
posted by Jessica McNaughton on
Is the heading of the table above "LEED 2012 Second Comment Period" incorrect? I am assuming it is, and these are the credits for the Third Comment Period.
M&V
posted by Marcus Sheffer on
I would also note that the credit referencing the IPMVP, which has been in LEED for at least a decade, was removed.
SS 5.1 Case 2. Previously Developed Areas or Graded Sites
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Ray Argue on
Within the notes to this LEED gives specifics on 'previously developed areas', but I have not come across what there definition of 'graded sites' is. A current project has a natural grade on the s
Materials & Resources Changes In LEED 3rd Public Comment Period
posted by Jessica McNaughton on
I still fail to see the reason that the Credits for Material Life Cycle Disclosure and Assessment and Responsible Extraction of Raw Materials are limited to two credits when the offer three differe
Naming Convention - Options/Compliance Paths
posted by Jessica McNaughton on
I find the naming convention of "option 1, option 2 etc" confusing in light of the fact that these are not really options or alternative ways of achieving a single credit, but rather can be combine
Zone Air Distribution Effectiveness
CS-2009 IEQp1:Minimum IAQ Performanceposted by Noriko Nagazumi on
Let me confirm the following ASHRAE 62.1-2007 Zone Air Distribution Effectiveness (Ez) issue. Our project utilizes total heat exchangers for ventilation.
Baseline in LEED reference guide and IPMVP
NC-2009 EAc5:Measurement and Verificationposted by Karoline Geneser on
Considering EAc5, both LEED Reference Guide and IPMVP use the term “Baseline”.
Commissioning existing energy systes
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Ken Dooley on
We have building renovation that is refurbishing 80% of a building aiming for CS 2009.
Achieving IEQp1 with no ventilation systems for C&S project
CS-2009 IEQp1:Minimum IAQ Performanceposted by Tony Schafer on
I’m wondering about how to comply with this credit for a C&S building that, upon initial completion, will be just a big warehouse space with no ventilation and the only HVAC equipment will be u