Forum quick links
IAQ Management Plan
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Maura Adams on
We used an EQc3.1 plan and used the testing method to meet EQc3.2 requirements.
Foundation and Footings
Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Swagata Guhathakurta on
Can anyone tell me why Foundation and Footings are eliminated from the LEED LCA Claculator? We have to input this information in the Athena EcoCalculator, but not in the LEED LCA Calculator?
Table EAc1.3-2
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Jason Dubose on
Are we to include lighting and small power line items in this table and electrical equipment for a data center?
Multiple buildings project with non-occupied buildings
posted by Sanghong Han on
Hi. I'm LEED AP but don't have experience for LEED certifications.
It was unclear to me in the
Schools-2009 MRc5:Regional Materialsposted by Nell Achtmeyer on
It was unclear to me in the calculator above, but when I have a product, say a concrete mix, that includes materials that were harvested and then manufactured at different locations, how do I track
Vestibules for conditioned buildings
CS-2009 EAp2:Minimum Energy Performanceposted by Julio Alvarado on
We have a CS project, climatized, on which the client is insisting we should not have entrance vestibules, which to my understanding is mandatory under ASHRAE 90.1.
LEED boundary and Major Additions
NC-2009 EAp2:Minimum Energy Performanceposted by Len Sciarra on
A new project, under LEED-NC, is a major addition to an existing building, in this case a manufacturing facility which will result in basically three sections New Office, Existing Office, and Exist
Sealant for Windows and Doors
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Adi Negara, LEED AP BD+C on
For this kind of sealant, can I just put it under Architectural Sealant?
What Rating System Should I Use?
posted by Kevin Griesemer on
My client has an existing 500,000 sf warehouse structure constructed in 2005. The tenant recently finished a 10,000 sf office build out within the structure.
Furniture Value
CI-2009 MRc4:Recycled Contentposted by severine secret on
When documenting the furniture value of an order for credits MRc4 thru Mrc7, do we include local tax, installation and freight on the total order?