Topic | Recent |
---|---|
Mechanical/HVAC Engineer sign-offEBOM-2009 IEQp1: Minimum indoor air quality performanceposted by Janna Nash on Feb 3, 2010, 9:50 pm
Could somebody tell me which... Last reply: Avkash Patel, Nov 10, 2010, 5:24 pm |
|
Mercury ContentEBOM-2009 MRc4: Sustainable purchasing - reduced mercury in lampsposted by Richard Navarro on Jul 7, 2010, 12:54 pm
Hi I was wondering what you are supposed to do if the manufacturer spec sheet has the number for picograms of mercury per mean lumen hour, but not the number for the amount of mercury content.... Last reply: Bill Swanson, Nov 11, 2010, 8:09 am |
|
Portables as diverted wasteSchools-2009 MRc2: Construction Waste Managementposted by Lisa Logan on Nov 10, 2010, 5:33 pm
Valerie, It turns out that the portables were shown on the drawings and in the specs "to be demolished". During bidding the GCs went to great lengths to find homes for them - which... Last reply: Valerie Walsh, Nov 11, 2010, 1:09 pm |
|
CS 2009 EAc1: Optimize Energy PerformanceCS-2009 EAc1: Optimize Energy Performanceposted by eileen hughes on Nov 11, 2010, 4:44 pm
My project is currently under Design Review for CS 2009, Design Reviewer has not been assigned yet so I cannot direct message directly to the Reviewer at the moment. Last reply: Marcus Sheffer, Nov 11, 2010, 5:08 pm |
|
Possible IO CreditEBOM-2009 IOc1: Innovation in Operationsposted by Maria Unruh on Nov 11, 2010, 4:26 pm
I have a question about the scope of this credit. I am working with a client who has started a large amount of initiatives to educate his building occupants about sustainability; forming a green... Last reply: Tristan Roberts, Nov 11, 2010, 9:12 pm |
|
BambooNC-2009 MRc7: Certified Woodposted by Mara Baum on Feb 5, 2010, 9:04 pm
Are bamboo products considered as a part of this calculation? Last reply: Tristan Roberts, Nov 11, 2010, 9:23 pm |
|
Can you count wood mulch in MRc4?NC-2009 MRc4: Recycled Contentposted by Kelly Pimmel on Oct 26, 2010, 12:58 pm
Can you count the use of... Last reply: Anne Nicklin, Nov 11, 2010, 10:09 pm |
|
VOC [carpet adhesive] content determined by rapid scheduleNC-2009 IEQc4.1: Low-emitting materials - adhesives and sealantsposted by Peter Feibelman on Nov 5, 2010, 1:52 pm
My builder has an accelerated construction schedule, a familiar pace for him. He reports that - with inadequate slab curing time - only a high... Last reply: Tristan Roberts, Nov 11, 2010, 11:41 pm |
|
Installation Dates for LEED On-lineEBOM-2009 EAc5: Enhanced Refrigerant Managementposted by Andrew Barnes on Nov 1, 2010, 4:29 pm
Good day everyone. For our project site we have listed all of the units, Last reply: Tristan Roberts, Nov 11, 2010, 11:58 pm |
|
Hardscape minimum areaNC-2009 SSc7.1: Heat island effect - nonroofposted by javier bolanos zeledon on Nov 10, 2010, 7:30 pm
Hi. This is a new 5000sqft office building within an industrial site. This new building will be attached to the main process area. At this moment everything surrounding the main process area is... Last reply: Tristan Roberts, Nov 12, 2010, 12:20 am |