ID credit for Organic Landscape Management
NC-2009 IDc1:Innovation in Designposted by jen T on
Help! Has someone been successful in pursuing the Organic Landscape Management of ID credit. I searched on the CIR's but couldn't find anything.
MERV 13 Filters on both Return and Outside Air (Re-Amended?)
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by EunChung Kim on
So it seems that as of July 2010, MERV 13 filters were only required on the outside supply air.
ESC Plan and CAPP Plan for Sloped Site
NC-2009 SSp1:Construction Activity Pollution Preventionposted by Arub Vijay on
We have a Hotel project which will be constructed on a mountain with the whole site having a slope towards west.
Increase in Ventilation - Precentage
NC-2009 IEQc2:Increased Ventilationposted by André Knutsson on
We are using VAV in some zones of the office building project we are building. When calculating the %-increase in ventilation for the IEQ c2, I wonder what VAV airvalue to use?
IEQp1 ASHRAE 62.1 Calculator
NC-2009 IEQp1:Minimum IAQ Performanceposted by Shannon Allison on
I read through previous posts and have not seen an answer to this question so forgive me if I missed it. The ASHRAE calculator does not seem to apply to 100% outdoor air systems.
FTE/calc guidance for hospitality
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Tristan Roberts on
FYI, the November 2011 addenda has two additional pieces of guidance on WEp1 calcs that are especially useful for hospitality:
Alternative LPE paths
EBOM-2009 SSc5:Site Development—Protect or Restore Open Habitatposted by SIG - Sustainability Main Account on
Are there any exceptions to the LPE for this credit? Specifically, could a Certified Arborist with ISA (International Society of Arboriculture) www.isa-arbor.com-be used in place of a RLA?
Low Glare High SRI Roof pavers for residential terraces
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Ilana Judah on
I am working on a multifamily residential project where the roof will be accessible to residents. Part of the roof will be green, and pavers will be installed on the non-green parts.
Unmet hours
NC-2009 EAp2:Minimum Energy Performanceposted by Sundararaj Subburaman on
Dear All, I am working on a project where the base case is packaged single zone and proposed case has split units. The unmet hours in proposed case is less than 300hours in each zone.