Forum quick links
Polished Plaster (Armourcoat Perlata) Categorization in LEED
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by mary ostafi on
I recently spent a great deal of time trying to determine where a polished plaster product (Armourcoat Perlata) falls into LEED.
HVAC Protection
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Patana Rattananavathong on
I have a project that don't use any HVAC system. It's all natural ventilation. Is it ok to left the HAVC protection out since there is nothing to protect.
Unable to Meet Pre-req during Current Performance Period
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Kristofer Kiszynski on
I was wondering what would happen if we failed to meet a prerequisite such as IEQp1. Would we need to restart our performance period after correcting whatever it is that needs to be corrected?
LEED for Homes - OPR ?
posted by Mike Barker on
While it is not required officially by LEED for Homes ( i think ?
viscose
CI-2009 MRc6:Rapidly Renewable Materialsposted by Giselle Walsh on
If a product has cotton and viscose blend, can I the entire product be considered rapidly renewable or just the cotton portion?
PI Form 3 - Occupant and Usage Data
posted by David Groseclose on
Question was posted - I seem to be having trouble with this form. it continues to state that the form is not complete. Answer- Make sure all of the boxes that are blank have a zero in them.
no local zoning
Schools-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Christine Teichert on
I looked on the ITE website and can't find a free version of this "Parking Generation". Any thoughts on where to find this and how to navigate through it to find the exact table I'm looking for??
SRI for Corrugated metal roof
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Noriko Nagazumi on
Our project has corrugated metal roof like which can be shown by clicking the link below. http://www.sakata-s.co.jp/product/88.html The roof will be installed almost horizontally as a whole.
No New Parking - to document alternative compliance or not?
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Cynthia Ottenbrite on
The project is an existing building - major renovation. The existing parking lot is being ripped up to drill the geothermal wells.
Energy Star Prerequisite - computer as process load
CI-2009 EAp2:Minimum Energy Performanceposted by Patricia Hancock on
We're an Applied Tech School that teaches CAD and complex simulation technologies.