I have a project that don't use any HVAC system. It's all natural ventilation. Is it ok to left the HAVC protection out since there is nothing to protect. Can the project apply for this credit?
You rely on LEEDuser. Can we rely on you?
LEEDuser is supported by our premium members, not by advertisers.
Go premium for
Dylan Connelly
Mechanical EngineerIntegral Group
LEEDuser Expert
472 thumbs up
November 4, 2011 - 7:36 pm
You can still apply for the credit.
However, you still need to create an IAQ Management Plan for the project. Also you will also need to ensure "absorptive materials (installed or stored on-site) were protected from moisture damage during the construction and preoccupancy phases."
Then select the option "Permanently installed air handling units WERE NOT operated during construction" on the form.