Forum quick links
Occupancy for Physical Therapy Rooms for LEED for Schools
Schools-2009 IEQc8.2:Daylight and Views—Viewsposted by Dana Murdoch on
I'm working on an early childhood education center that has a tenant that provides occupational and physical therapy to children on a one-hour appointment basis.
Window STC vs. OITC
Schools-2009 IEQc9:Enhanced Acoustical Performanceposted by Dana Murdoch on
If our windows have an STC of 35 but an OITC of 25 would they qualify? I don't think so, but I don't know how to interpret or relate the OITC to STC.
Indoor Carpet Adhesives
CI-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Colleen Ice on
Just curious I am working on IEQ 4.1 and IEQ 4.3. Both give you the option to add indoor carpet adhesives.
What to do?
EBOM-2009 EAc3.2:Performance Measurement—System-Level Meteringposted by Paola Figueiredo on
Our project team is working on LEED EBOM certification of an industrial compound, and there is a question we are not so sure about and we believe one of you may be able to help.
What if there's no A/C.
NC-2009 EAp2:Minimum Energy Performanceposted by Patana Rattananavathong on
What if the project don't have any A/C? there are 3 retails, 1 wc. All are separated buildings. What should I do with ASHRAE 5.4, 6.4 and for energy simulation?
Glass Piping
Pilot-Credits PC2:PBT Source Reduction: Dioxins and Halogenated Organic Compoundsposted by David Weimann on
Dear Brendan, note my comment from June of this year. When is the next review of the credit and when will it be updated to include glass piping? Thank you.
Pilot Credit 43 ISO 14044
Pilot-Credits PC43:Certified Productsposted by Bruce Maine on
The USDA Forest Products Lab generated an EPD in conformance with ISO 14044. Would this generic, non-product specific documentation qualify for Pilot Credit 43 or LEED 2012?
Regional Materials - raw material
NC-2009 MRc5:Regional Materialsposted by Felipe Duran on
Hello, we are working on a project that aims to get the LEED NC-2009 certification. We used a stone removed from the site to compose some walls, and therefore has no cost.
Hallways in Multi Family
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Joseph Blanco on
Can anyone tell me if Hallways would be included in a multifamily scenario. Typically this lighting is always on or on a timer.
Using a water table tank as a retaining method for compliance
CS-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Gabriela Hernández Castillo on
Our project is capturing rainwater and sending it to a water table tank (I don't know if this is the correct term, it is the tank that recieves water from the water table below foundations). The t