Forum quick links
PF Credit: Monitoring Based Commissioning
posted by Mark Campbell on
This is a fantastic credit. Really focuses on ongoing performance optimization.
Development Density and Diverse Uses - Option 3
posted by Michelle Howard on
Option 3 is titled "Dense and Accessible Location" which implies handicap accessibility, which does not appear to be the intent of the credit.
LEED 2012 Comments
posted by Jeff Chapman on
EA PREREQUISITE: MINIMUM ENERGY PERFORMANCE - ASHRAE 2010 is a necessary move for LEED 2012. I like the reduced options. Very simple and straight forward.
EBOM IP Credit: Discovery
posted by Mark Campbell on
I don't get the use of the word "integrative" in any of these EBOM credits. Integrative is very vague and open to broad interpretation.
Very late comments
posted by Jeff Chapman on
Sorry, I didn't get a chance to read all of your comments before posting so I am sure you covered this, but since the USGBC is weighting these comments I figured the redundancy would be important.
Sorry, late thread
posted by Jeff Chapman on
EQ PREREQUISITE: MINIMUM INDOOR AIR QUALITY PERFORMANCE: No Comment, other than I look forward to improvement of consistency for reviews.
I have an idea - Create a New Credit for Water Collection
posted by Jeff Chapman on
Similar to how in Location and transportation, you can achieve many points by doing a LEED ND site.
Long Term Commitment
CI-2009 MRc1.1:Tenant Space—Long-Term Commitmentposted by Tiago e Silva on
I got I bit confused with the period of time which is considered to comply with the aim of this credit. At first a thought the 10 year commitment counted from the date of the LEED certification pr
FTE for Schools
Schools-2009 WEc3:Water Use Reductionposted by David Mirabile on
When calculating the FTE's, what is typically done for summer months when school is not is session?
LEED Pressure Adjustment for Lab HVAC-Systems
CS-2009 EAc1:Optimize Energy Performanceposted by heinrich post on
Seems that some of my questions are not easy to answer. Here is another question for the same lab project. Fan system Power limitations are calculated according to Table 6.5.3.1.1A of ASHRAE 90.1-