Forum quick links
Highrise condo - What to monitor and meter
NC-2009 EAc5:Measurement and Verificationposted by Rob Hink on
With a 54 unit highrise condo, what would be acceptable to meter to meet the requirements of the credit. Individual unit electric meters?
Pavement and Trees
NC-2009 MRc2:Construction Waste Managementposted by Michelle Teague on
The definition of construction and demolition debris on page 362 of the technical guide says "pre-existing structures".
airflow limitation of lab spaces during unoccupied periods
CS-2009 EAc1:Optimize Energy Performanceposted by heinrich post on
According to Ashrae 90.1-2007 G3.1.1.d there should be a fan flow limitation for lab spaces in the baseline model during unoccupied hours. "For Lab spaces with a minimum of 5000 cfm of exhaust, use
Clarification on vision glazing between 30'' and 90''
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Stefania Minotti on
Hi, I have a question regarding IEQ credit 8.2 for a new building which we plan on certifying under the LEED 2009 rating system for NC.
General Comments re LEED 2012 MR Credits
posted by Peggy White on
I have been reviewing the 2012 Credit modifications over the last week or so, and I will try to produce some coherent and constructive comments in the official comment feedback before the 14th.
LEED 2012 Sustainable Sites Rainwater Management
posted by Yew-Hoe Tan on
While I appreciate the intent of trying to establish a baseline ecological state of the world prior to the discovery of the Americas, I think the "Pre-Columbian reference is unnecessary and America
Existing Exterior Lighting System
NC-2009 EAp2:Minimum Energy Performanceposted by Sundararaj Subburaman on
We are doing LEED certification for a building in a campus which already has exterior lighting installed.
Reclaimed Water
posted by Julie Hendricks on
In the Water Metering prerequisite it says: "If reclaimed water is used for any water credit, that reclaimed water component must be provided with a meter (regardless of rate).
Added $$ for Pre-Reqs in PF Category
posted by Julie Hendricks on
Overall, the prerequisites in this category are going to add significant cost to a base LEED certification over LEED 2009.
IEQc4.4 Addendum Question
posted by Lauren Fakhoury on
I asked GBCI about the changes to IEQc4.4 with your same questions, and the reponse was: The language in the addendum is meant for product manufacturers or project teams that are performing chamber