Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Highrise condo - What to monitor and meter

NC-2009 EAc5:Measurement and Verification
posted by  Rob Hink  on 

With a 54 unit highrise condo, what would be acceptable to meter to meet the requirements of the credit. Individual unit electric meters?

1
Mon Sep 19, 2011, 10:12 pm

Pavement and Trees

NC-2009 MRc2:Construction Waste Management
posted by  Michelle Teague  on 

The definition of construction and demolition debris on page 362 of the technical guide says "pre-existing structures".

1
Tue Sep 27, 2011, 2:32 am

airflow limitation of lab spaces during unoccupied periods

CS-2009 EAc1:Optimize Energy Performance
posted by  heinrich post  on 

According to Ashrae 90.1-2007 G3.1.1.d there should be a fan flow limitation for lab spaces in the baseline model during unoccupied hours. "For Lab spaces with a minimum of 5000 cfm of exhaust, use

1
Wed Sep 28, 2011, 8:18 pm

Clarification on vision glazing between 30'' and 90''

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Stefania Minotti  on 

Hi, I have a question regarding IEQ credit 8.2 for a new building which we plan on certifying under the LEED 2009 rating system for NC.

1
Tue Sep 13, 2011, 7:45 pm

General Comments re LEED 2012 MR Credits

General forums
posted by  Peggy White  on 

I have been reviewing the 2012 Credit modifications over the last week or so, and I will try to produce some coherent and constructive comments in the official comment feedback before the 14th.

1
Mon Sep 12, 2011, 9:01 pm

LEED 2012 Sustainable Sites Rainwater Management

General forums
posted by  Yew-Hoe Tan  on 

While I appreciate the intent of trying to establish a baseline ecological state of the world prior to the discovery of the Americas, I think the "Pre-Columbian reference is unnecessary and America

0

Existing Exterior Lighting System

NC-2009 EAp2:Minimum Energy Performance
posted by  Sundararaj Subburaman  on 

We are doing LEED certification for a building in a campus which already has exterior lighting installed.

1
Mon Sep 19, 2011, 5:29 pm

Reclaimed Water

General forums
posted by  Julie Hendricks  on 

In the Water Metering prerequisite it says: "If reclaimed water is used for any water credit, that reclaimed water component must be provided with a meter (regardless of rate).

0

Added $$ for Pre-Reqs in PF Category

General forums
posted by  Julie Hendricks  on 

Overall, the prerequisites in this category are going to add significant cost to a base LEED certification over LEED 2009.

1
Fri Sep 16, 2011, 1:23 pm

IEQc4.4 Addendum Question

General forums
posted by  Lauren Fakhoury  on 

I asked GBCI about the changes to IEQc4.4 with your same questions, and the reponse was: The language in the addendum is meant for product manufacturers or project teams that are performing chamber

0