General LEED-CI question
CI-2009 MRc4:Recycled Contentposted by Kimberly Cullinane on
I am working with a client that is looking at multiple new spaces in multiple locations.
PVs added after design submission
NC-2009 EAc2:On-Site Renewable Energyposted by Aliesa Adelman on
If an energy model has been reviewed during design phase submission and PVs are added during construction but were not included in the model, can the model be rerun and resubmitted during the const
Community Connectivity - residential density
CS-2009 SSc2:Development Density and Community Connectivityposted by Mark Pappas on
I am working on a project (LEED CS 2.0) that easily meets the services requirement, but I'm having a hard time with the residential density requirement.
Accumulating Annexes
posted by Paola Figueiredo, Newton Figueiredo on
The credits seem to be accumulating annexes, for example, after uploading an annex in the templates for the SS 4.1 credit, it appears later in the following credits as an upload, even for templates
Peak Demand Reduction Credit NOT Demand Response
Pilot-Credits EApc8:Demand responseposted by Debra Lombard on
HI Everyone, I am working on a LEED-NC v2.2 project which is small but has three technologies that reduce peak demand which is critical here in Connecticut. My question is how to calculate that %
Can 10' requirement be met by a combination of mats?
Schools-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Renee Shirey on
Due to space constraints, our vestibules were not able to be a full 10' wide between our doors, thus the recessed walkoff mats aren't 10'.
WEc2 Regional Priority Credit
EBOM-2009 RPc1:Regional Priorityposted by Kevin Wilcox on
I have a EBOM project where we have provided documentation for WEc2 and have exceeded the threshold for the RPC.
Development footprint exceeding previously developed
posted by Ricardo Sobral on
LTprerequisite1- Case 1- What happens is the new development footprint exceeds the previously developed portions of the site?
LEED Certification for Phase wise construction
posted by Ramesh Narayanan on
I have few clarification of whether the old constructed portion material should be considered for all the materials credits. The building has been developed by the developer which including the st
Tenant build-out
CS-2009 EAp2:Minimum Energy Performanceposted by Marco ZM on
We are in the process of modelling/simulating of office building in LEED C&S 2009 for EAp2 and EAc1 – Option 1. Building is divided into two parts: owner occupied space and offices for rent.