General LEED-CI question

CI-2009 MRc4:Recycled Content
posted by  Kimberly Cullinane  on 

I am working with a client that is looking at multiple new spaces in multiple locations.

1
Thu Aug 25, 2011, 9:51 pm

PVs added after design submission

NC-2009 EAc2:On-Site Renewable Energy
posted by  Aliesa Adelman  on 

If an energy model has been reviewed during design phase submission and PVs are added during construction but were not included in the model, can the model be rerun and resubmitted during the const

1
Mon Sep 19, 2011, 9:02 pm

Community Connectivity - residential density

CS-2009 SSc2:Development Density and Community Connectivity
posted by  Mark Pappas  on 

I am working on a project (LEED CS 2.0) that easily meets the services requirement, but I'm having a hard time with the residential density requirement.

1
Mon Aug 29, 2011, 3:23 pm

Accumulating Annexes

Living with LEED Online - quirks, bugs and hiccups
posted by  Paola Figueiredo, Newton Figueiredo  on 

The credits seem to be accumulating annexes, for example, after uploading an annex in the templates for the SS 4.1 credit, it appears later in the following credits as an upload, even for templates

0

Peak Demand Reduction Credit NOT Demand Response

Pilot-Credits EApc8:Demand response
posted by  Debra Lombard  on 

HI Everyone, I am working on a LEED-NC v2.2 project which is small but has three technologies that reduce peak demand which is critical here in Connecticut. My question is how to calculate that %

0

Can 10' requirement be met by a combination of mats?

Schools-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Renee Shirey  on 

Due to space constraints, our vestibules were not able to be a full 10' wide between our doors, thus the recessed walkoff mats aren't 10'.

1
Fri Aug 26, 2011, 7:03 pm

WEc2 Regional Priority Credit

EBOM-2009 RPc1:Regional Priority
posted by  Kevin Wilcox  on 

I have a EBOM project where we have provided documentation for WEc2 and have exceeded the threshold for the RPC.

1
Mon Aug 29, 2011, 3:07 pm

Development footprint exceeding previously developed

General forums
posted by  Ricardo Sobral  on 

LTprerequisite1- Case 1- What happens is the new development footprint exceeds the previously developed portions of the site?

0

LEED Certification for Phase wise construction

General forums
posted by  Ramesh Narayanan  on 

I have few clarification of whether the old constructed portion material should be considered for all the materials credits. The building has been developed by the developer which including the st

1
Mon Aug 29, 2011, 2:06 pm

Tenant build-out

CS-2009 EAp2:Minimum Energy Performance
posted by  Marco ZM  on 

We are in the process of modelling/simulating of office building in LEED C&S 2009 for EAp2 and EAc1 – Option 1. Building is divided into two parts: owner occupied space and offices for rent.

1
Wed Sep 28, 2011, 1:49 am