Upload requires WEP1-1 whichCS-2009 WEp1: Water Use Reductionposted by eileen hughes on Oct 22, 2010, 9:47 am
Upload requires WEP1-1 which is a plumbing fixture & fitting schedule. Last reply: Karen Blust, Nov 1, 2010, 7:36 pm |
|
Can i go for LEED CI?LEED Rating System Selectionposted by Simon Sue on Oct 28, 2010, 8:44 pm
I been asked and i did not have a definite answer for this, i have a client, who will build his own office tower and he asked whether is possible to certify one of the tower floor with LEED CI... Last reply: Simon Sue, Nov 1, 2010, 9:01 pm |
|
LEED Online and non-US RPC'sGeneral forumsposted by Cara Mae Cirignano on Nov 2, 2010, 1:54 pm
Thanks everyone for your comments. If a project has Regional Priority credits that are inconsistent with those publicly announced, USGBC asks that project team members use the LEED Online... |
|
re: documenting a credit from another LEED rating systemCI-2009 IDc1: Innovation in Designposted by Cara Mae Cirignano on Nov 2, 2010, 2:13 pm
Hi Leonard - |
|
DocumentationEBOM-2009 MRc5: Sustainable purchasing - foodposted by Andreas Hintz on Oct 1, 2010, 8:07 am
Hi, I`m working on an office building to gain LEED... Last reply: Natalie Bodenhamer, Nov 2, 2010, 6:48 pm |
|
Missing zip codesEBOM-2009 RPc1: Regional Priorityposted by Abigail Johnson on Nov 2, 2010, 8:07 pm
My project is located in 23707 in Hampton Roads Virginia. It is not listed in the... Last reply: Tristan Roberts, Nov 2, 2010, 9:20 pm |
|
green roof exemplary performanceNC-2009 SSc7.2: Heat island effect - roofposted by Kim Sosalla-Bahr on Nov 2, 2010, 1:23 pm
I have a question about meeting exemplary performance for credit SS 7.2. The reference guide states that, " Projects may earn an Innovation in Design credit for exemplary performance by... Last reply: Tristan Roberts, Nov 2, 2010, 10:52 pm |
|
The baseline flow rate forCI-2009 WEp1: Water Use Reductionposted by kyle atkinson on Nov 1, 2010, 1:50 pm
The baseline flow rate for lavatory sinks was reduced from 2.5 GPM to 0.5 GPM following after 2009. Last reply: Tristan Roberts, Nov 2, 2010, 11:05 pm |
|
Mechanical Engineer Signature Required?EBOM-2009 EAc5: Enhanced Refrigerant Managementposted by Andrew Barnes on Nov 1, 2010, 4:46 pm
I (not a mechanical engineer) calculated the leakage rates for this credit, but LEED online has a 'Required Signatory' box for this credit. Is this necessary to be signed off on? Last reply: Tristan Roberts, Nov 2, 2010, 11:07 pm |
|
How do you get two commissioning projects to qualify?NC-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Michael Dudek on Nov 1, 2010, 1:16 pm
My firm is a long-standing A/E firm that has multiple senior and junior engineers that are very capable of... Last reply: Tristan Roberts, Nov 2, 2010, 11:14 pm |