Walk-off mat size

Schools-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Will Britten  on 

The requirement for walk-off mats is vague in regards to size of mat required.

1
Fri Jul 15, 2011, 7:51 pm

Stormwater Management

EBOM-2009 SSc6:Stormwater Quantity Control
posted by  Randy Walsh  on 

Does installation of mechanical filter media into the storm drain help meet this requirement? (Flogard curb filter inlet)

1
Fri Jul 15, 2011, 9:17 pm

Precipitation Intensity - NOAA Website

EBOM-2009 SSc6:Stormwater Quantity Control
posted by  Randy Walsh  on 

Looking for Precipitation Intensity. New NOAA Site lets me select Precipitation Intensity and location and a site, but doesn't return any data.

1
Mon Dec 19, 2011, 11:14 pm

LEED for Schools Case 1 OR Case 2

Schools-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Dana Murdoch  on 

Can anyone comment on the Case 1 OR Case 2 for LEED for Schools? The letter template make allows you to use EITHER path, not BOTH as is implied in the text above in the LEED User interpretation.

1
Sun Jul 24, 2011, 5:54 am

EQc6.1 Documentation

Schools-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Dana Murdoch  on 

Does LEED have a form for inputing rooms/controllability in Version 3 like they did for Version 2.2?? Or do we just make up our own format?

1
Sun Jul 24, 2011, 5:49 am

ASHRAE/eQuest question - external blinds and SHGC requirement

CS-2009 EAc1:Optimize Energy Performance
posted by  Agnes Vorbrodt  on 

Hello, In a CS office building we specified SHGC=0.35 (for zone 5 ASHRAE requires

1
Fri Aug 26, 2011, 7:14 pm

Who may purchase RECs?

Schools-2009 EAc6:Green Power
posted by  James Keohane  on 

Is acceptable for a member of the design team or construction team to purchase RECs? May a project team purchase RECs using project contingency funds directed by Owner?

1
Mon Jul 18, 2011, 12:21 pm

ACP

Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materials
posted by  Whit Faulconer  on 

Thanks Batya, and Susan hit the nail on the head. Proposing that at some point an LCA based credit could be an ACP for some of the MR Credits is tricky for many reasons.

0

What about embedded Adhesives

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Maya Karkour  on 

Hello, Assuming the building is purchasing pre-made MDF, or plywood for interior installation.

1
Mon Jul 18, 2011, 4:53 pm

Tenant Electricity Meters

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  Mitch Gascoyne  on 

Does anyone have any experience with tenant sub-metering and compliance with this credit?