Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Green Advantage Innovation Credit for 2009 BD&C & NC v2.2

NC-2009 IDc1:Innovation in Design
posted by  liz boastfield  on 

Projects staffed with 30% or more of key personnel certified through Green Advantage are now eligible for award of 1 Innovation point.

0

Total Cost of Materials

NC-2009 MRc4:Recycled Content
posted by  J Morrison  on 

The LEED Online format for submitting the MR credit 4, 5, and 7 it asks for the "Cost per Item" and "Number of Items Purchased". I have to total cost of the items, but not the individual cost.

1
Tue Jul 26, 2011, 9:14 pm

Energy Modeling

CS-2009 EAp2:Minimum Energy Performance
posted by  Yolanda Sanchez  on 

In a LEED CS 2009 building energy simulation we are modeling the building envelope to test performance (only the building envelope).

1
Wed Sep 28, 2011, 2:10 am

HVAC System

CS-2009 EAc4:Enhanced Refrigerant Management
posted by  Yolanda Sanchez  on 

HVAC for the whole building is in the process of being designed (VRF system).

1
Mon Nov 21, 2011, 6:12 am

Earning Certs within 5 years

General forums
posted by  Barry Giles  on 

I presume that this is a new construction project that is currently in the process of design and will be built with a possible completion date of 5 years hence...or more.

0

HangarGrip Adhesive

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Elizabeth Powers  on 

The product in question is the Eco Hanger Grip Adhesive from MEI, described as "a construction-type paste adhesive specially designed for bonding insulation hangers to metal ducts and unfinished ma

1
Mon Jul 18, 2011, 5:23 pm

Scheduling for CS

CS-2009 IEQc3:Construction IAQ Management Plan—During Construction
posted by  BH .  on 

Dear all, we are making Core Shell project. Is it necessary to take into consideration flush out procedure during preparation of IAQ management plan in scheduling point?

1
Mon Nov 21, 2011, 3:30 am

Are garage areas counted?

EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessment
posted by  Paola Figueiredo, Newton Figueiredo  on 

To whom it may concern, I have a question that I did not find a solution to in the LEED EBOM Reference Guide or in the credit-by-credit forum on this website. In the audit that will be made in the

1
Tue Nov 15, 2011, 2:58 pm

Pilot LEED Credit for verification of recycling

Pilot-Credits PC43:Certified Products
posted by  Jeff Jones  on 

I am considering submitting a Pilot LEED Credit for verifying (or certifying) the actual recycling of building waste materials, whether it is from construction or an EBOM operation.

1
Mon Jul 25, 2011, 10:17 pm

third-party verification of landfill diversion docs (re-post)

NC-2009 MRc2:Construction Waste Management
posted by  Jeff Jones  on 

I am considering submitting a Pilot LEED Credit for verifying (or certifying) the actual recycling of building waste materials, whether it is from construction or an EBOM operation.

1
Mon Jul 25, 2011, 11:11 pm