Forum quick links
Reference building - garage
CS-2009 EAc1:Optimize Energy Performanceposted by Adam Targowski on
In the building for which I'm preparing energy simulation, there's an underground garage which is heated only by used recirculated air from offices above.
ASHRAE compliance with naturally ventilated building
NC-2009 EAc1:Optimize Energy Performanceposted by Jean Marais on
As per the guidelines, my baseline mechanical system is incorporated into the naturally ventilated design case model 1 to 1, as a priority 2 kind of system that kicks in when the naturally ventilat
Distribution and Vintage of REC's purchased in a Portfolio
NC-2009 EAc6:Green powerposted by Eric Elizondo on
Our client is a national banking program that has purchased REC's as a corporation in 2010 and 2011 as part of a corporate portfolio program.
Applicable for On-Site Renewable credit?
NC-2009 EAc2:On-Site Renewable Energyposted by Jeff H. on
My company is considering a geothermal system for an industrial facility.
SS 1 Option 2 Path 9
CI-2009 SSc1:Site Selectionposted by Augusto Velazquez on
I am having trouble filling out the LEED Online template for option 9.
why do we need to model heating if we have none
NC-2009 EAp2:Minimum Energy Performanceposted by Alicia Villanueva on
I am working in projects in Mexico and it has been a challenge to model heating when we have none. Sometime when modeling heating comes out higher in the proposed design than in the baseline and t
LEED registered projects
posted by Tristan Roberts on
Ed, USGBC maintains a database of registered LEED projects.
How many CO2 sensors are required per space?
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by William Wong on
Credit requires to monitor CO2 level for densely occupied spaces. Is there any requirements for the minimum no. of sensors per space / sq ft?
calculation assumptions
Pilot-Credits PC1: Life-Cycle Assessment (LCA) of Building Assemblies and Materialsposted by Susan Walter on
Now that we're digging into the credit, we have questions on the assumed thickness for items that are a SF input.
LEED for Homes - MR 2.2
posted by Natalie Connor on
This is my first time working on a LEED project for a residential construction company and I'm trying to finish up the final paperwork (basically the MR 2.2 section).