How to document glare control w/ prescriptive method?
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Bonnie Chiu on
I am documenting all the rooms in the building using the prescriptive method and I've checked the box that says 'the project has incorporated appropriate glare control devices...' in the credit for
Ground-Mounted Solar PV Arrays
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by J Douglas Dietrich on
If there is an open space with (1) a ground-mounted solar PV array and (2)native plantings or adapted vegetation beneath the PV panels and around them so as not to block sunlight, would the area be
Vendor Letter Sample/Template?
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Elliot Powers, LEED AP BD+C on
I may be mistaken, but I thought I saw in the Doc Toolkit some time ago that there was a template/sample available to send to vendors from whom our client makes purchases, and which would assist in
ARI Certification Requirement
NC-2009 EAp2:Minimum Energy Performanceposted by Udana Ratnayake on
We are working on a project in Sri Lanka where water cooled package units are to be used for air conditioning.
Case 2 Site with little decrease in Impervious Ratios
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by ryan mclean on
I am in the processing of accessing the feasibility of attaining this credit with a site that is currently 88% impervious and the proposed site is roughly 81% impervious.
Building Slabs: not in Developer's scope of work
CS-2009 EAp2:Minimum Energy Performanceposted by LEED Pro Consultant on
In a LEED CS 2009 building energy simulation: we are modeling the building envelope to test performance (only the building envelope).
LEED matrix
posted by Tristan Roberts on
Sarah, have you seen this LEED matrix spreadsheet? It is a matrix of linkages across credits.
Method Choosing
EBOM-2009 EAc1:Optimize Energy Performanceposted by Austin Evans on
This is an industrial manufacturing facility, and we have filed our data online with Energy Star as Other-Other.
Participation in Online Forum
Pilot-Credits PC6:Integrative Project Planning & Designposted by Miranda Gardiner on
You state the participation in the online forum is required for credit submission....but what does this exactly mean (e.g., does this question warrant participation?) and how should a team document
Multiple Projects pursuing Pilot Credits 5&6
Pilot-Credits PC5:Preliminary Integrative Project Planning & Designposted by Miranda Gardiner on
I have several projects planning to pursue PC 5&6 - how does this translate for online participation? Am I required to participate separately for each project?