How to document glare control w/ prescriptive method?

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Bonnie Chiu  on 

I am documenting all the rooms in the building using the prescriptive method and I've checked the box that says 'the project has incorporated appropriate glare control devices...' in the credit for

1
Sat Jul 9, 2011, 4:18 am

Ground-Mounted Solar PV Arrays

NC-2009 SSc5.1:Site Development—Protect or Restore Habitat
posted by  J Douglas Dietrich  on 

If there is an open space with (1) a ground-mounted solar PV array and (2)native plantings or adapted vegetation beneath the PV panels and around them so as not to block sunlight, would the area be

1
Wed Jul 27, 2011, 9:50 pm

Vendor Letter Sample/Template?

EBOM-2009 MRc2:Sustainable Purchasing—Durable Goods
posted by  Elliot Powers, LEED AP BD+C  on 

I may be mistaken, but I thought I saw in the Doc Toolkit some time ago that there was a template/sample available to send to vendors from whom our client makes purchases, and which would assist in

1
Fri Sep 2, 2011, 12:26 pm

ARI Certification Requirement

NC-2009 EAp2:Minimum Energy Performance
posted by  Udana Ratnayake  on 

We are working on a project in Sri Lanka where water cooled package units are to be used for air conditioning.

1
Fri Jul 15, 2011, 11:30 am

Case 2 Site with little decrease in Impervious Ratios

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  ryan mclean  on 

I am in the processing of accessing the feasibility of attaining this credit with a site that is currently 88% impervious and the proposed site is roughly 81% impervious.

1
Fri Jul 29, 2011, 2:44 pm

Building Slabs: not in Developer's scope of work

CS-2009 EAp2:Minimum Energy Performance
posted by  LEED Pro Consultant  on 

In a LEED CS 2009 building energy simulation: we are modeling the building envelope to test performance (only the building envelope).

1
Wed Sep 28, 2011, 2:12 am

LEED matrix

General forums
posted by  Tristan Roberts  on 

Sarah, have you seen this LEED matrix spreadsheet?  It is a matrix of linkages across credits.

0

Method Choosing

EBOM-2009 EAc1:Optimize Energy Performance
posted by  Austin Evans  on 

This is an industrial manufacturing facility, and we have filed our data online with Energy Star as Other-Other.

1
Mon Aug 15, 2011, 3:12 pm

Participation in Online Forum

Pilot-Credits PC6:Integrative Project Planning & Design
posted by  Miranda Gardiner  on 

You state the participation in the online forum is required for credit submission....but what does this exactly mean (e.g., does this question warrant participation?) and how should a team document

1
Tue Sep 11, 2012, 5:19 pm

Multiple Projects pursuing Pilot Credits 5&6

Pilot-Credits PC5:Preliminary Integrative Project Planning & Design
posted by  Miranda Gardiner  on 

I have several projects planning to pursue PC 5&6 - how does this translate for online participation? Am I required to participate separately for each project?

1
Wed Jul 6, 2011, 5:13 pm