Schedule of Values from GC - can we use the 45% default in EBOM?
EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additionsposted by candice groves on
In LEED NC, when given a price from a subcontractor, we're able to use a 45% default for the actual material cost in order to exclude labor from that price.
Pool SRI
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Luis Miguel Diazgranados on
Hi What about a pool? In this project we are working on, there will be a pool in a terrace on the roof. What would it be it's SRI? Or does it depends on the tiling used under water?
Classroom and Lecture Halls Building on a University Campus
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Lisa Chow on
Hello, My building is located on a university campus and contains just 2 classrooms and 3 lecture halls (~15.5 ksf).
Clarification of wording
Schools-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Gary Atkins on
In attempt to clarify the wording for IEQ4.1 and IEQ4.2 that states "...defined as inside the weatherproofing system and applied on-site..." does this mean that both conditions must be satisfied fo
Additions to Credit Language
Pilot-Credits PC2:PBT Source Reduction: Dioxins and Halogenated Organic Compoundsposted by David Weimann on
Hi Brendan, pilot credit 2 obviously correlates with Green Guide for Healthcare EP Credit 3.1-3.5 "Toxic Chemicals Reduction".
Climate zone outside the USA
NC-2009 EAp2:Minimum Energy Performanceposted by Xing Shi on
We just finished the design submittals of 2 projects in Jiangsu, China. Does ASHRAE set climate zone in China.
Average time expenditure for LEED Project Administration
posted by KC Kurtz on
All -- I work for a small Design-Build company in Durham, NC and we are looking to certify our new office building (12,000 sq. ft adaptive reuse) through LEED Core and Shell Rating system.
Showing a reduction?
EBOM-2009 SSc6:Stormwater Quantity Controlposted by American University on
I'm unclear as to how we show a reduction in stormwater runoff. I see how we calculate the current runoff by figuring the area type and using the formula given, but what does that get compared to?
Process loads different between proposed & baseline designs
NC-2009 EAc1:Optimize Energy Performanceposted by Santiago Rodriguez on
For a major renovation of a restaurant they have made a major substitution of old kitchen appliances to new, more efficient equipment.
When to use Table vs. Spec rated power
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by James Shook on
Can someone clarify when to use the Table 2 rated power number vs. specification rated power. My example: Have 90 new computer monitors going into the project.