Forum quick links
RP Credit Without a Threshold/Path
EBOM-2009 RPc1:Regional Priorityposted by Phillip Saieg on
The list of RP Credits for our project (zip code 80202) includes SSc6.
green power - purchased percentage
CI-2009 EAc4:Green Powerposted by Andy Plogsted on
Our client owns the building and occupies 50% of the square footage of a singularly metered building. The owner (our client) signed a contract to purchase green power for 30% of the total building
Bed Formatting
posted by Jason Chenard, PE on
Sorry for the bad formatting. It did not show on the preview, and I can not edit after submission, apparently. Blame MS Word. -Jason
Off Site Parking
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Jeff Mosher on
Can one acheive this credit via compliance path B. (no parking) if the facility has no on-site parking, but does have an off-site parking lot with a shuttle service?
Residential Units with Natural Ventilation
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Sustainability Provider on
Hello, I have two questions: 1) We have a residential multi-unit project with approximately 100 units. All the individual units are naturally ventilated with openable windows. (ie.
Permanent entryway walk-off systems at least 10 feet long
Schools-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Gendel Metlitsky on
Q #1: We are working on design of 10-story school in downtown of the major US city. Design calls for roof play yard.
T(vis) as a %
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Brynn Horley on
LEED (Canada) is requiring minimum T(vis) of 0.4 A manufacturer has provided me information which says that their product is 33% Visible Transmittance.
VOC Excluding Exempt and Including Exempt
CI-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Alan Bernstein on
I have two products that were used on our project. A primer and paint. The cut sheets from Manufacturer state the VOC Content is: Excluding Exempt: 275g/l and the Including Exempt is 103 g/l.
Operable Windows
CS-2009 IEQp1:Minimum IAQ Performanceposted by Luis Miguel Diazgranados on
We are working on a natural ventilated CS office building. The Leedonline form asks to fill in a table with the operable window area, in order to calculate ratio of window to occupiable area.
Baseline and design system selection
NC-2009 EAp2:Minimum Energy Performanceposted by Bala Srini on
Our semi industrial building's production area does not have cooling system, Proposed model simulated based on ASHRAE 90.1-2007, Table G3.1, 10. HVAC No.