Metering individual end uses >10%
NC-v4 EAc3:Advanced energy meteringposted by Carmen Mielecke on
Hello good morming, I would like to discuss the following example: If the simulation result on building level is, that the end use of lighting is >10% and the end use of user eq
2-year contract from what time?
NC-2009 EAc6:Green powerposted by Maria Porter on
I can find no evidence that the 2-year period needs to start as soon as the building is finished, is that the case?
is there a compliance path for multiple baselines?
NC-2009 EAp2:Minimum Energy Performanceposted by Courtney Royal on
Can LEED v2009 projects (which has ASHRAE 90.1-2007 baseline) demonstrate compliance using ASHRAE 90.1-2013? Is there any adjusted point scale which can be applicable for such projects?
Streams
NC-v4 MRc5:Construction and demolition waste managementposted by Charalampos Giannikopoulos on
In PR prerequisite it is required that 5 materials have been identified for diversion.
Does this count for LEED Credits?
NC-v4 MRc5:Construction and demolition waste managementposted by James Goldfield on
I am on a site where we have the option to chip the fallen tree's and stumps and sell that material to a power plant.
furniture made from laminated boards with A class according to French legislation
NC-v4 EQc2:Low emitting materialsposted by Agnieszka Rylska on
In our project we have plan to make individual furniture components from laminated boards on site.
Science behind maintaining internal temperature and relative humidity
NC-v4 EQc4:Indoor air quality assessmentposted by Dionisio Franca on
Hi.
LEED requires "maintaining an internal temperature of at least 60°F (15°C) and no higher than 80°F (27°C) and relative humidity no higher than 60%."
Credit Documentation Requirements
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jenelle Shapiro on
Is there a minimum requirement for supporting documentation for this credit in regards to uploading onto LEED Online?