Hand held Devices for measuring TVOC

NC-v4.1 EQc4:Indoor Air Quality Assessment
posted by  frederick muscatello  on 

Does anyone have any hand held meters for measuring TVOC they would recommend? 

1
Thu Dec 5, 2019, 9:35 pm
0

Solar energy production

NC-v4 EAc5:Renewable energy production
posted by  Nithya Madan  on 

Scenario 1 - Is solar energy produced inside the campus but outside of the project boundary considered towards the credit?

6
Founder & Senior Consultant
Viable LLC
LEEDuser Premium Member
12 thumbs up
Tue Nov 19, 2019, 9:02 pm

Zones served by mutli-zone unit but is exhausted separately

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Edgar Arevalo  on 

This may be nothing, but should I still count for zones that are served by a multizone unit but the ventilated air is not recirculated back to the unit?  The air is pretty much exhausted throu

5
Energy Engineer
ads ENGINEERS, DPC
LEEDuser Basic Member
21 thumbs up
Tue Nov 19, 2019, 3:03 pm

RCI Visual Inspections - STILL???

NC-v4.1 MRc5:Construction and Demolition Waste Management
posted by  Kimberlee Ilardi  on 

We have a project that is using a Certified Commingled Recycling Facility for their single-stream recycling and they are giving us visual inspections, with a breakdown of each waste strea

3
Vice President, Practices & National Sustainability Leader
Whiting-Turner
LEEDuser Premium Member
0 thumbs up
Fri Nov 15, 2019, 7:56 pm

Exterior Noise Control

Pilot-Credits EQpc57:Enhanced acoustical performance - exterior noise control
posted by  Alan Burt  on 

This project had several challenges related to exterior noise, it is in a busy area near downtown and at the time exposed to higher than typical noise levels from the exhaust system serving an unde

0

VOC/Emissions documentation for Casework/Millwork

CI-v4 EQc2:Low emitting materials
posted by  Tracy Marquis  on 

I am looking for some clarification pertaining to the VOC and emissions requirements for Casework and Millwork. 

7
Senior Sustainability Strategist
Jacobs Engineering
LEEDuser Premium Member
149 thumbs up
Wed Nov 13, 2019, 10:21 pm

LEED Documentation /Back Up

NC-2009 MRc5:Regional Materials
posted by  Heather Young  on 

I have been recently told that I need more proof on the distance of the Steel Mill to the job site to justify regional materials.

5
Environmental Business Development- LEED AP BD&C
Nucor Corporation
LEEDuser Basic Member
132 thumbs up
Wed Nov 13, 2019, 9:44 pm

O+M Table of Contents requirement for v4 Fundamental commisioning

CI-v4 EAp1:Fundamental commissioning and verification
posted by  Robert Fernandez  on 

I provided our primary LEED review with all of the following individually as each has its own upload to meet the intent of the credit but am being requested for an O+M table of contents for Fu

1
Fri Feb 28, 2020, 9:00 pm

LEED for Homes with Exterior Energy Uses- Prescriptive

Homes-v4 EAc1:Annual energy use
posted by  Angela Loughry  on 

I am working on a home that has significant energy uses not in a HERS rating - exterior pool and snowmelt.  I understand that you can go Option 1 under annual energy use.  What is unclear