Forum quick links
Simultaneously encouraging and frustrating...
posted by Brian Salazar on
Tristan - Nice article and review of the LEED "Feedback Plaque" as some folks are calling it. You asked for our feedback on the plaque itself as well and I have to admit that I'm conflicted.
Ventilation Effectiveness
NC-2009 IEQp1:Minimum IAQ Performanceposted by Dustin Balton on
I am working for a client who has a variable refrigerant HVAC system with a separate fully condition ventilator supplying fresh air.
An unusual situation with Recycling Tickets
NC-2009 MRc2:Construction Waste Managementposted by Christine Castellano on
As the general contractor on a recently completed LEED project, all of the tickets I've received from the off-site waste separation facility listed the tonnage diverted by item, i.e., concrete, met
Fire Department Practice Burn
NC-2009 MRc2:Construction Waste Managementposted by Brian Leet on
We have a project on a large campus which has involved demolition of over a dozen buildings.
No autosizing of equipment on proposed?
NC-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
Is there a reason why the equipment on the proposed can not be autosized?
Re-applying for a credit approved in Design submittal
posted by Shivani Langer on
At the time when we were submitting our design submittal, the elementary school project was only going to be able to get 7% of its energy offseted with renewables.
Survey for Sixth Graders
Schools-2009 IEQc7.2:Thermal Comfort—Verificationposted by Matthew Heaton on
A comment that came back on our IEQc7.2 design review asked us to "Please provide confirmation that the survey will be administered to include all building occupants, including students of grades s
Lose Leed Certification?
posted by Tim Meadows on
We have a parking deck that is LEED certified. We have several EV charging stations in employee and visitor areas.
Office Transient
NC-2009 PIf1:Minimum Program Requirementsposted by Nate Steeber on
I received some technical advice on my project regarding the occupancy. I have a mixed-use building. Primarily office spaces with a tenant fit out cafe and restaurant.