Forum quick links
LEED: Homes eligibility?
posted by Erica Downs on
Hello - We are starting major construction of our home, consisting of a gut-reno of the first floor; addition of a 2nd floor plus attic and porch; new mechanical systems, plumbing, electrical, wind
Chilled water pumping head > baseline design
NC-2009 EAp2:Minimum Energy Performanceposted by Victoria Watson on
Hi, h Has anyone come across issues with the chilled water pumps in the proposed and baseline building W/gpm being very different.
New Product
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Stefanie Smith on
Hello, Has anyone encountered a product that is new on the market and therefore is still in the process of becoming FloorScore Certified?
Simultaneously encouraging and frustrating...
posted by Brian Salazar on
Tristan - Nice article and review of the LEED "Feedback Plaque" as some folks are calling it. You asked for our feedback on the plaque itself as well and I have to admit that I'm conflicted.
Ventilation Effectiveness
NC-2009 IEQp1:Minimum IAQ Performanceposted by Dustin Balton on
I am working for a client who has a variable refrigerant HVAC system with a separate fully condition ventilator supplying fresh air.
An unusual situation with Recycling Tickets
NC-2009 MRc2:Construction Waste Managementposted by Christine Castellano on
As the general contractor on a recently completed LEED project, all of the tickets I've received from the off-site waste separation facility listed the tonnage diverted by item, i.e., concrete, met
Fire Department Practice Burn
NC-2009 MRc2:Construction Waste Managementposted by Brian Leet on
We have a project on a large campus which has involved demolition of over a dozen buildings.
No autosizing of equipment on proposed?
NC-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
Is there a reason why the equipment on the proposed can not be autosized?
Re-applying for a credit approved in Design submittal
posted by Shivani Langer on
At the time when we were submitting our design submittal, the elementary school project was only going to be able to get 7% of its energy offseted with renewables.