Existing Building Renovation and Site Work
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Catherine Adams on
We have an existing two-story community recreation center with an adjacent parking lot. Most(about 75%) of the building interior will be renovated, with some new windows added to the perimeter.
VOC Budget - Documentation
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Deborah Ebersole on
I am documenting the paints and coatings credit and I have one non-compliant paint that I need to offset. I want to do it with a single offset and I know that is allowable.
Materials Tracking
NC-2009 MRc4:Recycled Contentposted by Haley Duncan on
Hi, regardless of whether we use the default budget or actual materials cost, must we track every item that falls under the applicable divisions?
UFAD System: Underfloor plenum in baseline model?
NC-2009 EAp2:Minimum Energy Performanceposted by Eric Webber on
The proposed design is an Underfloor Air Distribution (UFAD) system utilizing an underfloor supply plenum and overhead return plenum. I am setting up the baseline model for LEED submission.
Potential ID Credit
NC-2009 IDc1:Innovation in Designposted by Ashley Bertling on
Good Morning! We'd like to use vegetable oil in our elevators instead of using hydraulic oil. Think this will count? The elevator technician said it will work just the same.
Tenant Finishes
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Ralph Bicknese on
For a museum project registered under NCv2009 there will be a museum store and food service areas that will be "finished by tenant".
Can I lock the credits not to be touched by other team members ?
NC-2009 IDc1:Innovation in Designposted by Matt Dem on
Hi, Is there any feature in LEED online to lock the credits not to be changed by other team members ?
Sports Practice Facility FTEs vs Transients
posted by David Browne on
I am working on an indoor practice facility for a university Division 1 athletic program and am having a difficult time deciding how to enter FTEs and transients in a project information form.
Can I defer any ID credit to submit it w/ construction package ?
NC-2009 IDc1:Innovation in Designposted by Matt Dem on
Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.
Compostable Trash Can Liners
EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materialsposted by Kimberlee Dobbins on
Can anyone help me figure out under which Sustainable Criteria Compostable Trash Can Liners would fall under?