Existing Building Renovation and Site Work

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Catherine Adams  on 

We have an existing two-story community recreation center with an adjacent parking lot. Most(about 75%) of the building interior will be renovated, with some new windows added to the perimeter.

3
Architectural Associate
Astorino|CannonDesign
LEEDuser Basic Member
0 thumbs up
Tue Jun 9, 2015, 9:15 pm

VOC Budget - Documentation

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Deborah Ebersole  on 

I am documenting the paints and coatings credit and I have one non-compliant paint that I need to offset. I want to do it with a single offset and I know that is allowable.

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Mon Jun 8, 2015, 1:52 pm

Materials Tracking

NC-2009 MRc4:Recycled Content
posted by  Haley Duncan  on 

Hi, regardless of whether we use the default budget or actual materials cost, must we track every item that falls under the applicable divisions?

3
Sat Jun 6, 2015, 2:50 am

UFAD System: Underfloor plenum in baseline model?

NC-2009 EAp2:Minimum Energy Performance
posted by  Eric Webber  on 

The proposed design is an Underfloor Air Distribution (UFAD) system utilizing an underfloor supply plenum and overhead return plenum. I am setting up the baseline model for LEED submission.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Jun 5, 2015, 2:50 pm

Potential ID Credit

NC-2009 IDc1:Innovation in Design
posted by  Ashley Bertling  on 

Good Morning! We'd like to use vegetable oil in our elevators instead of using hydraulic oil. Think this will count? The elevator technician said it will work just the same.

2
LEED Fellow 2011, Principal
Kath Williams + Associates
LEEDuser Premium Member
103 thumbs up
Thu Jun 4, 2015, 5:58 pm

Tenant Finishes

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Ralph Bicknese  on 

For a museum project registered under NCv2009 there will be a museum store and food service areas that will be "finished by tenant".

5
Principal
Hellmuth & Bicknese Architects
LEEDuser Premium Member
20 thumbs up
Thu Jun 4, 2015, 4:04 pm

Can I lock the credits not to be touched by other team members ?

NC-2009 IDc1:Innovation in Design
posted by  Matt Dem  on 

Hi, Is there any feature in LEED online to lock the credits not to be changed by other team members ?

2
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Thu Jun 4, 2015, 12:24 am

Sports Practice Facility FTEs vs Transients

Calculating FTEs
posted by  David Browne  on 

I am working on an indoor practice facility for a university Division 1 athletic program and am having a difficult time deciding how to enter FTEs and transients in a project information form.

2
Wed Jun 3, 2015, 4:55 pm

Can I defer any ID credit to submit it w/ construction package ?

NC-2009 IDc1:Innovation in Design
posted by  Matt Dem  on 

Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.

3
Default Avatar
LEEDuser Basic Member
3 thumbs up
Mon Jun 1, 2015, 9:17 pm

Compostable Trash Can Liners

EBOM-2009 IEQc3.3:Green Cleaning—Purchase of Sustainable Cleaning Products and Materials
posted by  Kimberlee Dobbins  on 

Can anyone help me figure out under which Sustainable Criteria Compostable Trash Can Liners would fall under?

4
Senior Marketing Manager
Veritiv
LEEDuser Basic Member
3 thumbs up
Thu May 28, 2015, 10:10 pm