NC-2009 EAc5:Measurement and Verificationposted by Edward Niemczycki on
We have nearly completed a LEED Silver project and they are still asking for simulation calibration procedures, calibration parameters, frequency of measurement and calibration accuracy for the EAc
Outpatient clinic
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Chris Miller on
Just received comments back in regards to fixtures, how come LEED does not allow exam room sinks to be included in the calculations for an outpatient clinic but do allow patient rooms for a hospita
Gym sinks- Private or Public?
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Kathryn West on
has anyone ever successfully argued that sinks in gym locker rooms are more akin to "private" fixtures? Folks do all sorts of things other than wash their hands in there.
Dormitory Lighting
NC-2009 IEQc6.1:Controllability of Systems—Lightingposted by Laura Brandt on
We have a traditional dormitory project, where each 170 sf room will house two students, each with a bed, desk and built in cabinet-type closet.
Greyed-Out credits in Design Submittal
posted by caitlin sweeney on
Hello - I have finished all of my design credits and am about to submit them. When I pressed 'submit', the active credits were highlighted.
Hospital Renovation - Occupancy Default Question
NC-2009 PIf3:Occupant and Usage Dataposted by Sara Zoumbaris on
Hi All - We are working on a major renovation of 1 floor that have patient rooms within a hospital.
Compliance for single story building
Pilot-Credits EQpc78:Design for active occupantsposted by Johnathan Woodside on
The title of the pilot credit implies occupant activeness in general, but the credit focuses significantly on staircases as the means of activity.
IEQ 4.4 - does veneer apply ?
NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Denise Bates on
The credit language states: particle board, MDF, wheatboard, door cores, and laminating adhesive used for assemblies. We have a reconstituted teak veneer that will go on wood panels and doors.
Appeal for additional credits after final review.
posted by Zane Lichtneger on
The Standard Preliminary Review is complete and the building has received 57 points. My question is- Can we submit for additional points not included in the initial submission?
Rounding of Percent Energy Cost Savings for EAc1 Points
NC-2009 EAc1:Optimize Energy Performanceposted by Joseph Chappell on
Hi all, We recently received a final design review where our percent energy cost savings have been corrected by the reviewer to show 31.95%.