Forum quick links
Eyeball Audits as Backup for Commingled Diversion
Homes-v2008 MRc3:Waste managementposted by Michelle Rosenberger on
Hi Ann, This is a repost from NC, MRc2. I am hoping that you can shed some light on this. Our Seattle region has a very developed state regulated construction waste diversion infrastructure.
Where is the line again?
NC-2009 MRc7:Certified Woodposted by Daniel Hartsig on
There are specific inclusions for bamboo and cork (neither are wood) in MRc7, but it is still unclear where to draw the line between solid, wood chip and wood fiber products that still look like wo
The amount of REC's necessary if onsite solar credits are sold
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by Edmée Knight on
My buildings roof is covered in solar panels that generate at least 20% of the building's annual energy.
Credit Form Problems
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by James Keohane on
I am having difficulty demonstrating compliance for Option C Occupancy Sensors.
Confusing language
Pilot-Credits EQpc78:Design for active occupantsposted by Rosemary Muller on
I strongly support this credit.
Resort Hotel and Condo
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by John Zehren on
I am working on a 7 story resort hotel and condo under LEED 2009 NC. We just received word that the 9 Condos on floors 6 and 7 will be finished at a future date.
Winter resort
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by John Zehren on
Our project is located in a winter ski resort village with heavy snowfall. The likelihood of someone biking here in the winter is slim.
EBOM Campus and Performance Periods
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Kath Williams on
How is the performance period determined when submitting EBOM campus credits under master site? Individual buildings will not be submitted for 8 more months but the campus credits are ready now.
Historical Building
NC-2009 EAp2:Minimum Energy Performanceposted by Khaled Fouda on
I am working on renovating a NYC historical building. per NYC Energy Conservation Code 101.4.2, this project is exempted from meeting the wattage allowance.
Lighting Controls Exemption
EBOM-2009 EAc3.1:Performance Measurement—Building Automation Systemposted by Katherine Roth on
Our project received the following review comment: "If any building spaces do not have automatic lighting control, provide information on the use and square footage of these spaces.