Forum quick links
Documentation Clarification
Mid-Rise-v4 EQc7:Low-emitting productsposted by Patty Lloyd on
So clarifying that for compliance with this credit, documentation that the product is complianct with CDPH v1.2 is enough?
Open Space and Vegetated space calculation
NC-v4 SSc3:Open spaceposted by Kavita Karmarkar on
Hi all,
Estimating energy savings from digital TAB measurements
posted by April Spence on
Hi all,
Do Diverse Uses Still Need to Be Publicly Available?
NC-v4.1 LTc4:Surrounding Density and Diverse Usesposted by Vanessa Nelson on
LEED NC v4.0 says diverse uses need to be available to the public. I don't see that language in the v4.1 reference guide. Was that requirement dropped?
If this Pilot Credit is pursued as an ID credit under initial ID+C certification, can Green Cleaning also be pursued?
Pilot-Credits INpc137:Cleaning and Disinfecting Your Space for Emerging Pathogensposted by Susan Di Giulio on
If this Pilot Credit is pursued as an ID credit under initial LEED-ID+C v4 certification, can Green Cleaning (as part of the O+M Starter Kit) also be pursued?
Light Pollution for Large Project Boundaries
Warehouses-EBOM-v4.1 SSc3:Light Pollution Reductionposted by Rick Fox on
I manage a 550k square foot warehouse operating at 24/7. All of our building lights, are LED and point down at the ground. Our pole lights are LED also and point down at a 45 degr
Lighting Control - Recording Studio
CI-v4 EQc6:Interior lightingposted by Edgar Arevalo on
I have a library project that has a recording studio in the basement. After reviewing the lighting control drawing, the space only have an ON/OFF switch with vacancy sensor. After
Patient Rooms
Pilot-Credits WEpc147:All-Gender Restroomsposted by Vanessa Hostick Rempe on
Does anyone have experience documenting this pilot credit on a hospital? It's unclear if the patient room should be included or excluded from the documentation and count.
Future medical office building - views methodology
CS-v4.1 EQc5:Quality Viewsposted by Jeremy Shiman on
We are pursuing the Quality Views credit on a CS project that was originally going to be the shell for a tech client, but will now be the shell for a MOB.
How do I calculate the total runoff, if I am required to send rainwater elsewhere?
EBOM-v4.1 SSc1:Rainwater Managementposted by Rick Fox on
I have so many questions concerning storm water management. My company is a large warehouse. We have 350 truck parking spots as well as 150 employee parking spots and a 525,000 sq