Forum quick links
NC Tenant Guideline Requirement
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Martha Norbeck on
Tenant Guidelines are a credit under Core and Shell, but are required under MPR if you have a tenant space in a New Construction project.
Military Dormitories
NC-2009 SSc2:Development Density and Community Connectivityposted by Paul Zanglin on
Does an area with military dormitories meet the intent of a 'residential area'? The military dormitories house single service members and geographical bachelors.
VOC Limit - Thread Cutting Oils
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Jason Biondi on
What is VOC limit for "Thread Cutting Oils" as per SCAQMD Standards to comply with LEED requirements ?
SSc4 Option 5 Delivery Service
Retail-NC-v2009 SSc4:Alternative transportationposted by Brian Coffman on
Regarding SSc4 Option 5 Delivery Service. The client/owner is a department store chain which has a main website that offers shipping for online purchases.
Interior Cross-Contamination Prevention, Industrial Curtain Wall
CS-v4 EQc1:Enhanced indoor air quality strategiesposted by Ashley Wisse on
Our project contains a theater scene shop including a small area where spray paint will occasionally be used.
Low Emitting Products
Homes-v4 EQc7:Low-emitting productsposted by Jess Harris on
Can somebody confirm that site applied paints, coatings, flooring, insulation, site applied adhesives and sealants need to meet the newer testing V1.1-2010, CA Section 01350.
Feedback on test results?
CI-v4 EQc4:Indoor air quality assessmentposted by Joanna Switzer on
Hey all, I've heard informally from one lab that they are seeing a number of v4 projects fail their IAQ tests - appears the newly introduced glycol level thresholds are a common obstacle.
The Eco Declaration
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Kristopher Croghan on
Many of our client's printers have received The Eco Declaration, an ECMA-370 Standard. Does this comply with the LEED 4 criteria?
Using different energy rates between CHP Proposed and Baseline
NC-v4 EAp2:Minimum energy performanceposted by Mark Benson on
I know that the 90.1 and the LEED Reference Guide generally tell you to use the same utility rate structures for both the Proposed and Baseline models.
LEED lease agreement for CS
CS-2009 IEQc2:Increased Ventilationposted by Alfonzo Collins on
I am working on a core & shell building. The owner will only be installing AHUs for a few core & shell spaces.