Forum quick links
ESv3 checklists
Mid-Rise-v4 EAp1:Minimum energy performanceposted by Sue Bryant on
The EAp1 v4 requirement is to meet ESv3 by completing the thermal enclosure system rater checklist, the HVAC system quality install rater and contractor checklist and the water management system bu
Submitting design prereq. credits during construction review
posted by kelly ryan on
Is it acceptable to submit design prerequisite credits during the construction review phase?
Shared Parking
CS-2009 SSc4.4:Alternative transportation - parking capacityposted by José Solis on
My LEED project will be using a garage that will be designed to serve four buildings.
Steel Extraction Location - Manufacturer Claim
NC-2009 MRc5:Regional materialsposted by Sara Zoumbaris on
Hi all, I am spinning my wheels second guessing what is now accepted.
ID Credit for Radon Mitigation system
NC-2009 IDc1:Innovation in designposted by Tyler Barter on
We recently submitted an Innovation in Design credit for the design and installation of a radon mitigation system at a recently completed project.
ENERGY STAR Equipment Calculator
CI-2009 EAc1.4:Optimize energy performance - equipment and appliancesposted by Sara Greenwood on
Hello, I see that the calculator is no longer available in the documentation toolkit on LEED User. Is this available elsewhere as it would be helpful in tracking compliance with this credit.
Updated/clarified primer voc limit
NC-2009 IEQc4.2:Low-emitting materials - paints and coatingsposted by Martha Norbeck on
Can you please update the FAQ section of LEED-NC v2009, IEQc4.2. The information on primers is out of date per interpretation/addenda #100001805.
Replacing filters prior to occupancy
Schools-2009 IEQc3.1:Construction IAQ management plan - during constructionposted by Ashley Love on
We have our preliminary review comments back and had a comment on this credit about the timeline of replacing the filters.
Number of signs required to be considered "comprehensive"
NC-2009 IDc1:Innovation in designposted by Kristin Walsh on
I have an ID credit for Green Education pending because the number of signs in the Signage Program is not enough to be considered comprehensive.
Pre-Rinse Spray Valves in Laboratories
NC-2009 WEp1:Water use reductionposted by Wyatt Suddarth on
I have several pre-rinse spray valves that were specified by an external laboratory consultant in a college laboratory building that do not appear to meet the requirement of being less than or equa