Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

ESv3 checklists

Mid-Rise-v4 EAp1:Minimum energy performance
posted by  Sue Bryant  on 

The EAp1 v4 requirement is to meet ESv3 by completing the thermal enclosure system rater checklist, the HVAC system quality install rater and contractor checklist and the water management system bu

1
Fri Apr 21, 2017, 7:26 pm

Submitting design prereq. credits during construction review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  kelly ryan  on 

Is it acceptable to submit design prerequisite credits during the construction review phase?

1
Fri Oct 17, 2014, 4:45 pm

Shared Parking

CS-2009 SSc4.4:Alternative transportation - parking capacity
posted by  José Solis  on 

My LEED project will be using a garage that will be designed to serve four buildings.

1
Fri Mar 25, 2016, 6:37 pm

Steel Extraction Location - Manufacturer Claim

NC-2009 MRc5:Regional materials
posted by  Sara Zoumbaris  on 

Hi all, I am spinning my wheels second guessing what is now accepted.

1
Fri Jan 16, 2015, 6:55 pm

ID Credit for Radon Mitigation system

NC-2009 IDc1:Innovation in design
posted by  Tyler Barter  on 

We recently submitted an Innovation in Design credit for the design and installation of a radon mitigation system at a recently completed project.

1
Tue Aug 9, 2016, 2:50 pm

ENERGY STAR Equipment Calculator

CI-2009 EAc1.4:Optimize energy performance - equipment and appliances
posted by  Sara Greenwood  on 

Hello, I see that the calculator is no longer available in the documentation toolkit on LEED User. Is this available elsewhere as it would be helpful in tracking compliance with this credit.

1
Thu Nov 17, 2016, 9:57 pm

Updated/clarified primer voc limit

NC-2009 IEQc4.2:Low-emitting materials - paints and coatings
posted by  Martha Norbeck  on 

Can you please update the FAQ section of LEED-NC v2009, IEQc4.2. The information on primers is out of date per interpretation/addenda #100001805.

0

Replacing filters prior to occupancy

Schools-2009 IEQc3.1:Construction IAQ management plan - during construction
posted by  Ashley Love  on 

We have our preliminary review comments back and had a comment on this credit about the timeline of replacing the filters.

1
Fri Jun 9, 2017, 12:34 pm

Number of signs required to be considered "comprehensive"

NC-2009 IDc1:Innovation in design
posted by  Kristin Walsh  on 

I have an ID credit for Green Education pending because the number of signs in the Signage Program is not enough to be considered comprehensive.

1
Wed Jan 13, 2016, 9:01 pm

Pre-Rinse Spray Valves in Laboratories

NC-2009 WEp1:Water use reduction
posted by  Wyatt Suddarth  on 

I have several pre-rinse spray valves that were specified by an external laboratory consultant in a college laboratory building that do not appear to meet the requirement of being less than or equa

1
Wed May 18, 2016, 2:45 am