Multiple indentical RTUs combined with plenum ducts

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Chanyang Shin  on 

Multiple identical RTUs combined with plenum ducts serve a whole building. How can I prepare 62.1 MZcal? Can I add up cfm of all RTUs and assume it like one system using one sheet?

1
Thu Aug 18, 2016, 8:13 pm

Hot Water and Chilled Water Primary- Secondary Pumping

NC-2009 EAp2:Minimum energy performance
posted by  ESD Engineer  on 

My project has Primary chilled water pumping and multiple distribution pumps after the heat exchange serving various AHU/RTU cooling coils.

1
Mon Jul 17, 2017, 6:07 pm

Protect or Restore Habitat - 2.5 acre Pond

NC-2009 SSc5.1:Site development - protect or restore habitat
posted by  Katherine Carlin  on 

We are restoring a pond by removing invasive plant species and replanting with native plant species.

1
Mon Jun 1, 2015, 8:32 pm

Commercial Refrigeration Systems

EBOM-v4 EAc8:Enhanced refrigerant management
posted by  Meier Corporate Account  on 

I would like some clarification on what LEED considers a commercial refrigeration system in regards to leak check reports. I have 2 different systems in my plant...

1
Fri Aug 19, 2016, 4:54 pm

MR c7 forms

NC-2009 MRc7:Certified wood
posted by  Mark Ramsey  on 

As a millwork subcontractor with a FSC COC number where can we go to get detailed information on how and what is required to fill out the MRc7 forms.

1
Mon Apr 13, 2015, 3:04 pm

Double Ridership - access to transit station

NC-2009 SSc4.1:Alternative transportation - public transportation access
posted by  Erin Holdenried  on 

If a bus servicing your LEED project connects to a bus transfer station (within 2 miles/10 min) of the project site.

1
Wed Aug 17, 2016, 4:49 pm

Is touch-up paint exempt?

NC-2009 IEQc4.2:Low-emitting materials - paints and coatings
posted by  Erin Holdenried  on 

This LEED Interpretation states that touch-up paint consists of small unanticipated quantities that can't be controlled by specifications, and therefore is exempt from the credit.

1
Thu Sep 24, 2015, 4:27 am

2 Types of Tviz in each window

NC-2009 IEQc8.1:Daylight and views - daylight
posted by  Ileana Schinder  on 

The windows in my project have 2 types of t-viz in each window (above 8'0 is non visible light). How do you document 2 types of tviz in a single room? the excel file doesn't accomodate for that.

1
Wed Feb 22, 2017, 5:43 pm

Wool/Biobased material

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Peter Harenda  on 

I am trying to clarify if 100% wool design felt would classify as a bio-based material for option 2. The portion on skin is where the question arises. Thank you.

1
Fri Jun 9, 2017, 11:04 am

No Smoking Signage for a University Dormitory

EBOM-v4 EQp2:Environmental Tobacco Smoke Control
posted by  Patricia Andrasik  on 

Currently we have no smoking signs on the residence hall's main entrances, the ones used by residents to get in and out of the building.

1
Wed Apr 6, 2016, 11:15 pm