colorants (for polished concrete floor) containing formaldehyde?
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Debra a. Lombard on
we are a GC on a LEED NC v2009 project. we'll be doing both IAQ testing as well as a limited flush out, not nearly the Air exchanges for just doing flush out.
Multiple Points for One RPC
NC-2009 RPc1:Regional Priorityposted by Suzanne Johnson on
Water efficient landscaping is listed as an RPC in the database for a project. It states "WEc1 I Up to 4 Points".
Rooftop Greenhouse
Schools-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Sarah Nugent on
Hi everyone, I have an urban project which is installing a greenhouse for educational purposes.
Monitoring VRF unit
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Edmée Knight on
We are installing an air cooled VRF system with a DOAS in our building.
EAp2 Domestic Hot Water Pump sizing
NC-2009 EAp2:Minimum Energy Performanceposted by MKK LEED on
Hello, Appendix G Table G.3.1 - Service Hot water systems states "The service hot-water system in the baseline building design shall use the same energy source as the corresponding system in
Requirement to survey students in higher ed bldgs?
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Renee Shirey on
In earlier versions of LEED 2009, the credit language specifically clarified that occupants included students grade 6 and above.
Bird Collision Deterrence: Summary of Material Threat Factors
Pilot-Credits SSpc55:Bird collision deterrenceposted by Alysa Hoffmeister on
What is the process to have additional materials submitted, approved and added to the Bird Collision Deterrence: Summary of Material Threat Factors document?
Green-E Equivalency
EBOM-2009 EAc4:On-Site and Off-Site Renewable Energyposted by David Ellner on
We have pursued EAc4, using a combination of on site and off site renewable energy sources. On site sources is not a problem.
EApc95 - Alternative Energy Performance Metric questions
NC-2009 EAc1:Optimize Energy Performanceposted by Jamy Bacchus on
This pilot credit includes a XL file with tables B through H to calculate savings in terms of GHGs, site energy, source energy, energy cost, peak demand and "if available": TDV and Primary Energy F
Interpretation for Underground Stormwater Retaining System
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Candice Rogers on
Good morning - We have a project that is greenfield.