Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Commingled or Source Separated

NC-2009 MRc2:Construction Waste Management
posted by  Risto Beatty  on 

Could someone please help define the meaning of 'source separated' in terms of the Material Stream credit calculator?

1
Mon Oct 24, 2016, 2:21 pm

Construction Application Phase

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Stephanie Santiago  on 

Good afternoon, I have a question regarding submitting documents for the Construction Application phase. This is the first project I have done and I am lost on where to start.

1
Tue Aug 25, 2015, 1:04 pm

IAQ Management Plan and IAQ Management Specification Section

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Bridget Brock  on 

I am working on a project where LEED was almost an after thought. I was brought into the project just after the 60% submittal.

1
Sun Dec 13, 2015, 9:03 am

Roof Area Clarification

CS-2009 SSc7.2:Heat Island Effect—Roof
posted by  Maggie Hogan Skaug  on 

Looking for a clarification on the "Roof Area" definition, in particular, what constitutes an "open covered parking structure".

1
Mon Nov 30, 2015, 11:20 pm

pc14 for Historic School building in urban context

Pilot-Credits PC14:Walkable Streets
posted by  Kristian Whitsett  on 

We were inspired to test out this credit because of the huge increase in students walking to school after we completed a full renovation of a historic school in North Adams, MA.

0

Option 1 and Option 2?

NC-v4 SSc5:Heat island reduction
posted by  Jonathan Weiss  on 

For a project where we're pushing for parking garages for the cars, but have asphalt driveways, can we consider the footprint of the garage as hardscape that meets the requirement?

1
Thu Apr 16, 2015, 9:47 pm

measuring heat pump load for system submetering

EBOM-2009 EAc3.2:Performance Measurement—System-Level Metering
posted by  ethan adams  on 

I have about 35 ceiling- mounted heat pumps throughout the building, and it would be cost-prohibitive to install a separate meter on each one.

1
Mon Nov 30, 2015, 8:16 pm

Canopy to building with wall opening (is it a "complete bldg")?

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  John Lee  on 

We have a project that is an existing canopy converted into a building without a 15' wide wall on one side. There will be a 10'x15' enclosed office inside this building.

1
Fri Nov 27, 2015, 3:52 am
1
Wed Feb 1, 2017, 11:51 pm

Tenant Installed Equipment and Appliances

CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliances
posted by  James Keohane  on 

I am working on a project wherein the equipment and appliances are installed by the tenant AFTER completion. I can get date from tenant/agency on proposed equipment.

1
Wed Dec 23, 2015, 5:35 pm