Forum quick links
Pilot Credit Closed
Pilot-Credits EQpc22:Interior lighting - qualityposted by Laurel Swan on
This Pilot Credit is now listed as closed to new registrations and I do not see it in the Innovation Catalog. Does that mean that this is no longer an option for an Innovation in Design credit?
BAS - whole building
EBOM-2009 EAc3.1:Performance measurement - building automation systemposted by Craig Wilson on
If our project's BAS controls 100% of the building's heating and air conditioning, but only 35% of the building's ventilation (by square footage), can we still pursue this credit?
IEQc4 - Schools v2009- Alternative Compliance from CA to SCAQMD
NC-2009 IEQc4.1:Low-emitting materials - adhesives and sealantsposted by Z Smith on
We are working on a LEED Schools v2009 project.
Concrete and Asphalt from Demolition
NC-v4 MRc5:Construction and demolition waste managementposted by James Keohane on
What is the best way to include demolition materials such as concrete and asphalt in CWM calculation?
Campus Project
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by P Fanfulik on
I have a project consisting of two buildings which was registered as a campus project. When using Portfolio Manager, am I required to benchmark as a campus?
LEED Pilot Credit 30
NC-2009 SSc4.1:Alternative transportation - public transportation accessposted by S. Sachs on
We are pursuing v2009 certification on an office building for this credit using Pilot Credit 30 for bicycle routes (alternative compliance path); however, since this project started the pilot credi
Occupancy Count for Residential
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Iris Amdur on
We have a mixed-use (residential, retail, office) project that wants to implement a vehicle sharing program for this credit.
green cleaning term
NC-2009 IDc1:Innovation in designposted by Alfonzo Collins on
I received a comment on a design phase review that since this is a core & shell building, the owner has to either include green cleaning in the lease, or agree to control the cleaning for both
Street trees in a winter resort
Pilot-Credits PC14:Walkable Streetsposted by John Zehren on
Our project is bounded by a stream on one side, a road on another and 2 sides are on an active pedestrian mall (non motorized) with retail and restaurants meeting the height to width ratio.
LEED Schools or LEED CI?
Schools-NC-v4 MPR2:Must use reasonable LEED boundariesposted by Peter Doo on
We are pursuing an interior renovation of a k-12 school building to ongoing school use. Can we use LEED CI or must we use LEED Schools?