Default Space Susage Types - are there definitions?

CI-2009 PIf3:Occupant and Usage Data
posted by  Stacey Olson  on 

I have a building which is permitted as B occupancy (office), which provides services to outpatients, but does not diagnose or exam. Is there a definition of "Medical Use" I can refer to?

1
Sat Aug 26, 2017, 11:55 pm

LEED approved paints and coatins

NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatings
posted by  Luis Galvan  on 

If a lacquer or varnish meets the low VOC criteria required by IEQc4.2 but does not state that it qualifies to meet LEED requirments.

1
Thu Feb 2, 2017, 3:06 pm

PV system on Conference Center

Pilot-Credits EApc56:Renewable energy - distributed generation
posted by  Patrick Cellie  on 

Hi, a Conference Center seeking recertification under EBOM v2009 has an installed PV system that seems to have all the requirements of the pilot credit: - the building doesn't use any of the ener

0

1-floor renovation in an 2009 EBOM Certified Building

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  John Krutko  on 

I am proposing on a project in which the scope is the renovation of a single floor of a 10 story building that is currently LEED 2009 EBOM certified.

1
Wed Apr 12, 2017, 8:28 pm

No longer required to complete Design prereqs before review?

NC-2009 EAp2:Minimum Energy Performance
posted by  Susan Di Giulio  on 

From what I have read about the new website, it is no longer required to complete all design prerequisites before submitting for Design Review (split review assumed).

1
Thu Jan 15, 2015, 3:44 am

Credit Still Open?

Pilot-Credits PC12:Reduced Automobile Dependence
posted by  Rachel Bannon-Godfrey  on 

Can your confirm that this credit it still open or not? We are pursuing LEEDv4. Thanks!

1
Thu Jun 9, 2016, 3:30 pm

Determining site area on lot with multiple buidings

Mid-Rise-v4 SSc2:Rainwater management
posted by  Phil Vanderloo  on 

Can someone help me with how to determine the total site area for calculations on a lot with an existing residence, and a future LEED certified accessory dwelling.

1
Mon Mar 7, 2016, 7:16 pm

Baseline system selection

NC-2009 EAp2:Minimum Energy Performance
posted by  MKK LEED  on 

I have a building that is roughly 20,000ft2 of office, plus another 13,000ft2 of underground parking that is heated to 50F.

1
Tue Feb 14, 2017, 12:10 am

Increasing certification level after accepting certification?

General forums
posted by  Tommy Linstroth  on 

Is it possible to improve your certification level after accepting final certification?

1
Thu Apr 27, 2017, 8:58 pm

WEc3 denial

NC-2009 WEc3:Water Use Reduction
posted by  Therese Thompson  on 

We received our final review on Friday, and do not understand why Credit WEc3 was denied.

0