Forum quick links
Default Space Susage Types - are there definitions?
CI-2009 PIf3:Occupant and Usage Dataposted by Stacey Olson on
I have a building which is permitted as B occupancy (office), which provides services to outpatients, but does not diagnose or exam. Is there a definition of "Medical Use" I can refer to?
LEED approved paints and coatins
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Luis Galvan on
If a lacquer or varnish meets the low VOC criteria required by IEQc4.2 but does not state that it qualifies to meet LEED requirments.
PV system on Conference Center
Pilot-Credits EApc56:Renewable energy - distributed generationposted by Patrick Cellie on
Hi, a Conference Center seeking recertification under EBOM v2009 has an installed PV system that seems to have all the requirements of the pilot credit: - the building doesn't use any of the ener
1-floor renovation in an 2009 EBOM Certified Building
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by John Krutko on
I am proposing on a project in which the scope is the renovation of a single floor of a 10 story building that is currently LEED 2009 EBOM certified.
No longer required to complete Design prereqs before review?
NC-2009 EAp2:Minimum Energy Performanceposted by Susan Di Giulio on
From what I have read about the new website, it is no longer required to complete all design prerequisites before submitting for Design Review (split review assumed).
Credit Still Open?
Pilot-Credits PC12:Reduced Automobile Dependenceposted by Rachel Bannon-Godfrey on
Can your confirm that this credit it still open or not? We are pursuing LEEDv4. Thanks!
Determining site area on lot with multiple buidings
Mid-Rise-v4 SSc2:Rainwater managementposted by Phil Vanderloo on
Can someone help me with how to determine the total site area for calculations on a lot with an existing residence, and a future LEED certified accessory dwelling.
Baseline system selection
NC-2009 EAp2:Minimum Energy Performanceposted by MKK LEED on
I have a building that is roughly 20,000ft2 of office, plus another 13,000ft2 of underground parking that is heated to 50F.
Increasing certification level after accepting certification?
posted by Tommy Linstroth on
Is it possible to improve your certification level after accepting final certification?
WEc3 denial
NC-2009 WEc3:Water Use Reductionposted by Therese Thompson on
We received our final review on Friday, and do not understand why Credit WEc3 was denied.