CI-2009 MRp1:Storage and Collection of Recyclablesposted by Bharati Bhosale on
Came across a good reference for estimating recycling rates on EPA's website - a question that a lot of people have, since we are seeing that being brought up by reviewers.
registering a project
NC-2009 MPR4:Must comply with minimum floor area requirementsposted by Megan Bove on
Good morning. I am trying to register a project that is 7,893.3 square feet.
What constitutes a building entrance?
CI-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Carolyn Day on
We are working on a tenant fit-up on the 8th floor of a downtown building which sits on a corner. The first floor has several retail establishments with direct street access.
Trace 700 Performance Summary Report
NC-2009 EAp2:Minimum Energy Performanceposted by Aru Sau on
Is the Performance Summary Report generated by Trane Trace 700 (Ver 3.0) be enough for the LEED V4 EA credit?
Access to Const credits while under Design Review?
posted by Renee Shirey on
In this updated format of LEED v3, can you access and upload information into Construction credits while a Design review is going on?
Three buildings, one garden
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Lawrence Lile on
We are developing a farmer's market. It will be associated with a community garden, which grows food for both the farmer's market and the local food bank.
Utility Renewable Portfolio Credit
NC-v4 EAc7:Green power and carbon offsetsposted by Brent Tokita on
My local utility has independent certification of it's current renewable portfolio, can this be credited against the Green Power percentage? e.g.
SSc2
NC-2009 SSc2:Development Density and Community Connectivityposted by Erika Duran on
I am working towards the SSc2 credit. Two buildings are currently under construction and floor and site area are unavailable. What should I do? Thanks, Erika
62MZCalc
NC-2009 IEQp1:Minimum IAQ Performanceposted by Gordon Nielson on
I noticed, I cannot enter rooms that require exhaust like restrooms and lockers. Do I exclude them on the excel spread sheet?
Organic Fertilizer
EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Managementposted by Andy Rhoades on
My landscaper is using a 100% Natural Organic component fertilizer with a ratio of 3-3-2.