Forum quick links
No Mow Grass
Schools-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Cynthia Kaplan on
My Massachusetts school project is restoring a large area and considering No Mow grass. Will this be considered as a monoculture like turf grass, or a meadow?
Project using EApc67 for Minimum and Optimize Energy Performance
Pilot-Credits EApc67:Energy Jumpstartposted by Greg Romanczyk on
We've registered for EApc67 for our LEED O+Mv4 project.
PI Form4 - Lease Requirement
CI-2009 PIf4:Schedule and Overview Documentsposted by Ludmilla Pavlova-Gillham on
My University (12M GSF, 13 divisions, 54 major business units, over 250 major departments), has a multi-use building (287,000) that is undergoing a commercial retail renovation on the ground floor
Can I defer any ID credit to submit it w/ construction package ?
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Matt Dem on
Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.
tenant requirements to maintain compliance with IEQc8.1 and 8.2
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Gail Napell on
Has anyone had comment from GBCI when taking these credits for a speculative C&S office building? We provide a proposed tenant layout that shows the interior complying with these credits.
shuttle bus to rail station
CI-2009 SSc3.1:Credit Alternative Transportation—Public Transportation Accessposted by Gail Napell on
we have a project with the main entrance 0.3 miles from 4 public shuttle bus stops that provide express connections to a commuter (and regional, and national!) railway station.
New to LEED Submitals
posted by Joel Clonch on
I have a mill-work submittal that requests : LEED Submittals: 1. Product Data showing VOC content does not exceed 30 g/L for wood adhesives and 80 g/L for contact adhesives. 2.
The three dimensional orientation of the luminaire
Pilot-Credits SSpc7:Light pollution reductionposted by Aly Rawji on
Can you please provide a sample for this, what is required for "The three dimensional orientation of the luminaire (plan/ elevation)"?
Implementing on a university campus
Pilot-Credits PC14:Walkable Streetsposted by Dee Spiro on
When I searched the forum for insight on how to apply/adapt some of the requirements for a campus setting, the posts were from way back in August 2012.
Cooling Towers at Central Plant
NC-v4 WEp2:Indoor water use reductionposted by Risto Beatty on
If cooling towers are located offsite at a central utility plant, does the project need to comply with the cooling tower requirements of this prerequisite?