Forum quick links
Envisioning this credit for condo building in Harlem
EBOM-v4 LTc1:Alternative transportationposted by Charlotte Matthews on
Residents and condo owners rarely respond to surveys.
EBOM SSc2: policy vs practice for snow removal
EBOM-2009 SSc2:Building Exterior and Hardscape Management Planposted by Drew DePalma on
Hi, I have read in this forum that if no deicer is applied during a performance period that a project would be in compliance with that element of the SSc2 credit requirements.
Commercial Coffee Brewers
CI-2009 EAc1.4:Optimize Energy Performance—Equipment and Appliancesposted by Donald Green on
Under the Energy Star Partner Program there is a listing for Commercial Coffee Brewers V1.0 as of 7/2016 - however when you go to the Find Products there is NO listing for Commercial Coffee Brewers
RE: Would we exclude interior walls that were never permitted?
NC-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Diane Hale CHMM, CDGP, CEM, CESCO on
We have an existing older building that had interior walls and sectioned rooms put in that were never permitted and were not code compliant.
Making the Shipping Company Take the Packaging?
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Kimberlee Dobbins on
I know I read about a company doing this, but I can not seem to find who it was, or how it was done.
Resinous Flooring
CI-v4 EQc2:Low emitting materialsposted by Marcia Weekes on
Would resinous flooring be evaluated under the Flooring or Paints & Coatings category?
CxA for Enhanced
CI-v4 EAc1:Enhanced commissioningposted by Tony Haschke on
The project is under 20,000 sq. ft and only a tenant finish in an existing building. Can the CxA be an employee of the design firm for the enhanced Cx?
Pressure drop adjustment factor with DOAS System
CS-2009 EAc1:Optimize Energy Performanceposted by Curtis Clark on
In the proposed model, we have a HEPA 13 filter in a dedicated outdoor air unit which serves a variable refrigerant flow system.
IEQc8.1 Core and Shell credit with no tenant fit out
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Shelly Christman on
We are in a design build arrangement with an architect and owner to construct an office building with no planned tenant fit out at this time.
raw material invoice submital
Schools-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Esther Kohout on
I am trying to locate the info that shows the total cost of material is to be used in LEED calulations, not including the installation labor.