Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Recycling Rates - Facts and Figures

CI-2009 MRp1:Storage and Collection of Recyclables
posted by  Bharati Bhosale  on 

Came across a good reference for estimating recycling rates on EPA's website - a question that a lot of people have, since we are seeing that being brought up by reviewers.

0

registering a project

NC-2009 MPR4:Must comply with minimum floor area requirements
posted by  Megan Bove  on 

Good morning. I am trying to register a project that is 7,893.3 square feet.

1
Fri Nov 27, 2015, 3:33 am

What constitutes a building entrance?

CI-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Carolyn Day  on 

We are working on a tenant fit-up on the 8th floor of a downtown building which sits on a corner. The first floor has several retail establishments with direct street access.

0

Trace 700 Performance Summary Report

NC-2009 EAp2:Minimum Energy Performance
posted by  Aru Sau  on 

Is the Performance Summary Report generated by Trane Trace 700 (Ver 3.0) be enough for the LEED V4 EA credit?

1
Wed Jan 18, 2017, 4:50 pm

Access to Const credits while under Design Review?

General forums
posted by  Renee Shirey  on 

In this updated format of LEED v3, can you access and upload information into Construction credits while a Design review is going on?

0

Three buildings, one garden

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Lawrence Lile  on 

We are developing a farmer's market. It will be associated with a community garden, which grows food for both the farmer's market and the local food bank.

1
Tue Jan 17, 2017, 6:21 pm

Utility Renewable Portfolio Credit

NC-v4 EAc7:Green power and carbon offsets
posted by  Brent Tokita  on 

My local utility has independent certification of it's current renewable portfolio, can this be credited against the Green Power percentage? e.g.

1
Thu Aug 31, 2017, 9:16 pm

SSc2

NC-2009 SSc2:Development Density and Community Connectivity
posted by  Erika Duran  on 

I am working towards the SSc2 credit. Two buildings are currently under construction and floor and site area are unavailable. What should I do? Thanks, Erika

1
Fri Aug 12, 2016, 5:29 pm

62MZCalc

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Gordon Nielson  on 

I noticed, I cannot enter rooms that require exhaust like restrooms and lockers. Do I exclude them on the excel spread sheet?

1
Mon Jul 6, 2015, 10:21 pm

Organic Fertilizer

EBOM-2009 SSc3:Integrated Pest Management, Erosion Control, and Landscape Management
posted by  Andy Rhoades  on 

My landscaper is using a 100% Natural Organic component fertilizer with a ratio of 3-3-2.

1
Tue Jun 6, 2017, 12:52 am