Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

FTE calculations and bicycle parking

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Nicholas Klever  on 

I am working on certifying an addition to a military readiness center which operates drill weekends so the facility occupants greatly increases for 2 those 2 days each month.

1
Fri Nov 27, 2015, 2:21 pm

Diverse Uses within a Shopping Center

CS-v4 LTc4:Surrounding density and diverse uses
posted by  Frank Sherman  on 

The planned C+S development is a shopping center that will include retail, restaurants, a grocery store and movie theater.

1
Tue Jan 17, 2017, 8:13 pm

LEED Online Form Help for Process Water

Retail-CI-v2009 WEp1:Water use reduction
posted by  Sara Zoumbaris  on 

Hello, I have a project with three pieces of process water equipment and I have a few questions about the form. 1.

0

Pursing credit in an existing building

Pilot-Credits EQpc78:Design for active occupants
posted by  Dee Spiro  on 

Our project involves renovating an existing building on a university campus.

0

Required to use facility weighted average?

Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Rates
posted by  Eileen Gohr  on 

"Recycling rates applied to a project's waste generation must be the weighted average for the facility over the time in which the project sent materials to the facility." Does this mean that proje

0

Integrative Pilot Credit - Design or Construction Credit

Pilot-Credits PC60:Integrative Process
posted by  Devki Wright  on 

Hi there - when submitting the documentation for this credit, is this considered a design or construction credit?

1
Tue May 24, 2016, 12:12 am

Duct Testing and Cleaning

NC-2009 IEQc3.1:Construction IAQ Management Plan—During Construction
posted by  Ramon Ramos  on 

What is the criteria for triggering duct testing and cleaning reports for both plans?

1
Tue Aug 29, 2017, 1:23 am
1
Fri Jul 22, 2016, 5:23 pm

90% controls for open office systems furniture

CI-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Brian VanAllen  on 

As the electrical design engineer; what is an acceptable means for me to meet the 90% controllability requirement on my drawings- for open offices?

0

Multi-family Mid-rise EA Pre-req 1 - Option 2

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Pournamasi Rath  on 

Hi, I have a quick question regarding LEED for Homes Multi-family Mid-rise EA Pre-req 1 - Option 2 (see reference document here - http://www.usgbc.org/sites/default/files/Energy%20and%20Atmosphere%

1
Thu Jan 26, 2017, 8:53 pm