Forum quick links
additional heating system
NC-2009 EAp2:Minimum Energy Performanceposted by Alfonzo Collins on
I am working on a high-rise residential building with VRF. The building envelope is heavily glass, so the owner has decided to also install a hydronic heating system at the building perimeter.
Master's Research Survey
NC-2009 MRc4:Recycled Contentposted by Vibha Pai on
I am conducting this survey in affiliation with University of Cincinnati in support of my hypothesis for my Master's thesis. It would just take 10-15 minutes of your time.
outdoor air flow monitoring location
CS-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Lily Li on
FOR DOAS unit, can the outdoor air flow monitoring located in supply air side?
Kitchen Hoods with gas make-up air unit
NC-2009 EAc1:Optimize Energy Performanceposted by James Sullivan Jr. on
I've been trying to understand how does LEED treat kitchen exhaust hoods with make up unit(heating only) in the energy model. Is it process or non-process?
Use of Hycrete waterproofing admixture for Innovation credit
NC-2009 IDc1:Innovation in Designposted by Donna Juselis on
Our project is a mixed use redevelopment in a flood prone area. The first floor slab-on-grade on the project is located below the design flood elevation.
Solar Tubes in Energy Pro
NC-2009 EAp2:Minimum Energy Performanceposted by Logan Dorrell on
How would we model a solar tube light fixture in Energy Pro Software? We want to get the light thru it, but not the heat.
FTE of unoccupied gutted adjacent tenant
posted by Andrew Bennett on
under case 2 option 1 this space would not add any FTE to the building total right? v3 Commercial Interiors
LEED Healthcare 2009 - Minimum Energy Performance Calculator
Healthcare-v2009 EAp2:Minimum energy performanceposted by Christie Morris-Withers on
Hello all, I need assistance in finding the subject Minimum Energy Performance Calculator that I am required to complete for Option 1. Whole Building Energy Simulation.
Existing Dining Facility Building v3 rating system
posted by Emily Wang on
I'm working on an existing Dining facility which has a significant amount of interior renovations and a small amount of NC, and exterior.
Reference Building – Try #2
Pilot-Credits MRpc63:Whole building life cycle assessmentposted by Dirk Kestner on
Resurrecting Mark Webster’s previous thread – I am finalizing a PC 63 submission and I’m curious what strategy others have used to define the reference building.