Forum quick links
Interpretation for Underground Stormwater Retaining System
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Candice Rogers on
Good morning - We have a project that is greenfield.
Ventilation Effectiveness
posted by Dustin Balton on
I am working for a client who has a variable refrigerant HVAC system with a separate fully condition ventilator supplying fresh air.
Autocontrol vs smart sensor-activated faucets and duration times
NC-v4 WEp2:Indoor water use reductionposted by Heather DeGrella on
Per the LEEDv4 Reference Guide "Duration-based savings from auto-control faucets w/ automatic fixture sensors or metering controls are no longer allowed in the design case.
EBOM 2009 IEQ3.2 Alternative Compliance Path
EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by Kimberly Hosken on
Our project is a five story public building with operational contracts which include "contract document requirements".
Regularly Occupied or Not?
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Cynthia Estrada on
Hello- I don't know if anyone has asked this question or not, it is a rather unique situation.
what all is included in material cost
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Brianna Brandsen on
Is labor to deliver (i.e. drive time, time to unload materials, and / or shipping costs from suppliers) and / or unload materials on a job site included in the material cost?
Utility sells "Community Solar" in yearly blocks - NOT Green-e
NC-2009 EAc6:Green powerposted by Joyce Kelly on
The local Utility sells "Community Solar" in yearly blocks - is NOT yet Green-e certified but willing to provide all the data required to be Green-e certified.
IEQc4 - Schools v2009- Alternative Compliance from CA to SCAQMD
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Z Smith on
We are working on a LEED Schools v2009 project.
Concrete and Asphalt from Demolition
NC-v4 MRc5:Construction and demolition waste managementposted by James Keohane on
What is the best way to include demolition materials such as concrete and asphalt in CWM calculation?
Campus Project
NC-2009 MPR6:Must commit to sharing whole-building energy and water usage dataposted by P Fanfulik on
I have a project consisting of two buildings which was registered as a campus project. When using Portfolio Manager, am I required to benchmark as a campus?