Do Recycling Rooms need to be Negatively Pressurized?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Nicole Pandolfo on
Do recycling rooms need to be negatively pressurized to meet the requirements of Interior Cross-Contamination Prevention in LEED V4 now that recylcing rooms must include the collection of batteries
Basement renovation to a LEED Platinum Building
posted by Faith Wilbert on
How do you go about a renovation in a LEED Plaitnum building? Do you have to do a recertification or another process. Theay are renovating 1 floor and I'm not sure the approach I need to take
Change to Cx agent
NC-v4 EAp1:Fundamental commissioning and verificationposted by Cindy Quinn on
I'm working on a v4 project currently in CD design phase.
ASHRAE Level II Audit qualification
EBOM-v4 EAc1:Existing building commissioning—analysisposted by Alexa Stone on
Can an ASHRAE Level II Audit conducted in 2014 qualify for usage for this credit?
Definition of "modification"
CI-v4 EAp2:Minimum energy performanceposted by Todd Tewksbury on
This question is regarding the Energy and Atmosphere prerequisite Minimum Energy Performance and associated credit Optimize Energy Performance under the LEED v4 Interior Design and Construction rat
Non-default Daily Use Values
Healthcare-v2009 WEp1:Water use reductionposted by Christie Morris-Withers on
What is non-default daily use values of water usage? How do I estimate them. This is required to be uploaded for the LEED-online WEp1. Thank you in advance for your help
University Dorm with Designated Parking
NC-v4 LTc7:Reduced parking footprintposted by Heather Zeto on
I am working on a project located on a University Campus. The building usage/type is most closely related to a dormitory.
Is there a minimum % of new floors, walls, ceilings, etc. for a major renovation of an existing building under NC-v4?
NC-v4 MPR3:Must comply with project size requirementsposted by Craig Wilson on
Is there a minimum % of new floors, walls, ceilings, etc. for a major renovation of an existing building under NC-v4? We are trying to decide between O+M and NC for a major renovation.
MR Credit - 20% of WHAT number for the cutsheets
NC-2009 MRc4:Recycled Contentposted by Denise Domino on
What are going off of for the 20%? 20% Material Cost???