repositioned non-historic building in a historic DISTRICT
CS-v4 LTc3:High priority siteposted by Gail Napell on
we're renovating a NON-HISTORIC building in a HISTORIC district. new façade, new MEP systems, structural upgrades. Does this meet the intent of Option 1?
NC-v4 MRc5 Option 2: Clarification of floor area for multi-phase renovation project.
NC-v4 MRc5:Construction and demolition waste managementposted by Yasha Ogg on
I am working on a multi-phase project and I was wondering, does Option 2: Reduction of total waste material (Do not generate more than 2.5 pounds of construction waste per square foot of the b
Area not in scope of project
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Carl Rappa on
We have a renovation & addition project where the CM wants to do the Option 2: Air Testing to achieve IEQc3.2.
Historic District
NC-v4 LTc3:High priority siteposted by Ashlen Williams on
Our project site is determined to be eligible for the National Register of Historic Places. Does this eligibility satisfy the requirement? Thanks in advance for your feedback.
Lighting Controls in Unoccupied Spaces
EBOM-2009 EAc3.1:Performance Measurement—Building Automation Systemposted by Clint Fogg on
Good afternoon, I am working on credit EAc3.1 for an EBOM project in an Office Building built in 1904. I am looking for information with regards to the 100% lighting control statement.
Including Locker Rooms in IEQp1 Calculations
Schools-NC-v4 EQp1:Minimum indoor air quality performanceposted by Elizabeth Galloway on
We are currently working on completing the design documentation for a large high school pursuing LEED v4.
Lactation Room WEp1 Sink Calcs
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Rob Hink on
We have a NC project that has a lactation room with a sink in the room of a cruise terminal. There will be 345 FTEs and 7,000+ Visitors on a daily basis.
WEc1 Thresholds Tab
NC-2009 WEc1:Water Efficient Landscapingposted by H M on
Within the WEc1 "Thresholds" tab, there is a green button that reads "Submit". Are you supposed to click this button in order for the credit to be ready for review?
IEQ Space Matrix?
NC-v4 EQp1:Minimum indoor air quality performanceposted by Erica Downs on
Is the IEQ Space Matrix still relevant for this Prereq under v4?