Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

repositioned non-historic building in a historic DISTRICT

CS-v4 LTc3:High priority site
posted by  Gail Napell  on 

we're renovating a NON-HISTORIC building in a HISTORIC district.  new façade, new MEP systems, structural upgrades.  Does this meet the intent of Option 1?

 

1
Tue Dec 4, 2018, 8:02 pm
4
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Thu Apr 12, 2018, 3:26 pm

NC-v4 MRc5 Option 2: Clarification of floor area for multi-phase renovation project.

NC-v4 MRc5:Construction and demolition waste management
posted by  Yasha Ogg  on 

I am working on a multi-phase project and I was wondering, does Option 2: Reduction of total waste material (Do not generate more than 2.5 pounds of construction waste per square foot of the b

1
Wed Apr 11, 2018, 1:23 pm

Area not in scope of project

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Carl Rappa  on 

We have a renovation & addition project where the CM wants to do the Option 2: Air Testing to achieve IEQc3.2.

0

Historic District

NC-v4 LTc3:High priority site
posted by  Ashlen Williams  on 

Our project site is determined to be eligible for the National Register of Historic Places. Does this eligibility satisfy the requirement? Thanks in advance for your feedback.

6
Design Engineer
LEEDuser Expert
19 thumbs up
Mon Apr 9, 2018, 4:13 pm

Lighting Controls in Unoccupied Spaces

EBOM-2009 EAc3.1:Performance Measurement—Building Automation System
posted by  Clint Fogg  on 

Good afternoon, I am working on credit EAc3.1 for an EBOM project in an Office Building built in 1904.  I am looking for information with regards to the 100% lighting control statement. 

1
Wed May 2, 2018, 12:51 pm

Including Locker Rooms in IEQp1 Calculations

Schools-NC-v4 EQp1:Minimum indoor air quality performance
posted by  Elizabeth Galloway  on 

We are currently working on completing the design documentation for a large high school pursuing LEED v4.

1
Mon Jul 16, 2018, 4:17 pm

Lactation Room WEp1 Sink Calcs

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Rob Hink  on 

We have a NC project that has a lactation room with a sink in the room of a cruise terminal. There will be 345 FTEs and 7,000+ Visitors on a daily basis.

1
Wed Apr 4, 2018, 8:57 pm

WEc1 Thresholds Tab

NC-2009 WEc1:Water Efficient Landscaping
posted by  H M  on 

Within the WEc1 "Thresholds" tab, there is a green button that reads "Submit". Are you supposed to click this button in order for the credit to be ready for review?

0

IEQ Space Matrix?

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Erica Downs  on 

Is the IEQ Space Matrix still relevant for this Prereq under v4?

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Tue Apr 3, 2018, 6:46 pm