right of ways adjacent to project?
ND-Plan-v4 NPDc7:Transit facilitiesposted by Ian Scott on
Given how a project boundary is supposed to be defined, either the project side of the right of way or the far side (non-project side) of the right-of-way, for this credit how do you deal with tran
Living Wall
Retail-NC-v4 WEc4:Water meteringposted by Joanne Sawatzky on
We have a CI project and are targeting this as an innovation credit. There is not outside space, but there is a living wall inside.
Major Renovation prerequisites
posted by Vanessa Poirier on
Hi all, In the case of a Major Renovation project, are all prerequisites must be answered (in all categories) or only the ones for the categories affected by the project.
Credit Points
Healthcare-v4 IPc1:Integrative processposted by Christine Chow on
The Reference Guide shows 1-5 points are available for this credit under the Hospitality and Healthcare rating systems. Is it explained anywhere how the variation of points is awarded?
Coat area - regularly occupied?
NC-2009 IEQc8.2:Daylight and views - viewsposted by Eric White on
We have an K-6 school project which is mostly views-compliant. One issue we are having in getting above 90% views requirement is the coat area at the rear of the classroom.
Manufacturer Declaration Letter
NC-2009 MRc4:Recycled contentposted by Rezkar Abdulmajeed on
We completed the design of our project in 2013 and start construction in 2014.
Option 2 Meaning of "Contiguous Area"
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Daniel Smith on
Some of the air handling units at the site (police station) where I will be conducting air testing serve more than one area on a given floor, and these areas are not directly connected to each othe
green roofs
NC-v4 WEp1:Outdoor water use reductionposted by Geoffrey Katz on
Hello all, Under Option 1 are vegetated (green) roofs considered as part of the landscape that requires (or does not require) a permanent irrigation system?
Pre-Consumer Recycled Content
EBOM-v4 MRc1:Purchasing - ongoingposted by Claire Bannister on
How is pre-consumer recycled content calculated in v4? In v2009, there were columns for both pre- and post- consumer.
LEED V4 DATA CENTER
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Caroline Vallieres on
There is a new data center extension to an existing building of a different use (office). The extension is accessible via a corridor. The buildings do share an electrical box.