Post a question or comment
Location Filters
Filter by location
Forum
Topic
Replies
Recent

Living Wall

Retail-NC-v4 WEc4:Water metering
posted by  Joanne Sawatzky  on 

We have a CI project and are targeting this as an innovation credit. There is not outside space, but there is a living wall inside.

1
Tue Jan 17, 2017, 9:17 pm

Major Renovation prerequisites

LEED Rating System Selection
posted by  Vanessa Poirier  on 

Hi all, In the case of a Major Renovation project, are all prerequisites must be answered (in all categories) or only the ones for the categories affected by the project.

1
Tue Jan 31, 2017, 4:40 pm

Credit Points

Healthcare-v4 IPc1:Integrative process
posted by  Christine Chow  on 

The Reference Guide shows 1-5 points are available for this credit under the Hospitality and Healthcare rating systems. Is it explained anywhere how the variation of points is awarded?

1
Wed Aug 30, 2017, 2:17 pm

Coat area - regularly occupied?

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Eric White  on 

We have an K-6 school project which is mostly views-compliant. One issue we are having in getting above 90% views requirement is the coat area at the rear of the classroom.

1
Tue Jan 20, 2015, 1:16 pm

Manufacturer Declaration Letter

NC-2009 MRc4:Recycled Content
posted by  Rezkar Abdulmajeed  on 

We completed the design of our project in 2013 and start construction in 2014.

1
Mon May 4, 2015, 1:45 pm

Option 2 Meaning of "Contiguous Area"

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Daniel Smith  on 

Some of the air handling units at the site (police station) where I will be conducting air testing serve more than one area on a given floor, and these areas are not directly connected to each othe

1
Mon Oct 31, 2016, 2:10 pm

green roofs

NC-v4 WEp1:Outdoor water use reduction
posted by  Geoffrey Katz  on 

Hello all, Under Option 1 are vegetated (green) roofs considered as part of the landscape that requires (or does not require) a permanent irrigation system?

1
Wed Mar 29, 2017, 3:11 pm

Pre-Consumer Recycled Content

EBOM-v4 MRc1:Purchasing - ongoing
posted by  Claire Bannister  on 

How is pre-consumer recycled content calculated in v4? In v2009, there were columns for both pre- and post- consumer.

1
Tue May 30, 2017, 10:08 pm

LEED V4 DATA CENTER

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Caroline Vallieres  on 

There is a new data center extension to an existing building of a different use (office). The extension is accessible via a corridor. The buildings do share an electrical box.

1
Mon Dec 8, 2014, 6:21 pm

High-Volume vs. Convenience Copier 5,000 pages - CIR 872 Canada

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Lindsey Kindrat  on 

Heads up for those working on LEED Canada NC 2009 projects, CIR 872 ruled 5,000 pages per month as the definition limit for a convenience copier. Ruling provided 2012-06-08.

0