Forum quick links
Third Party Review v4?
NC-v4 EAp2:Minimum energy performanceposted by SBS Department on
Does anyone know if either prereq EA - Minimum Energy Performance, or the Optimize Energy Performance credit need a third party review as it did under the CaGBC's LEED 2009?
Does restaurant dishwashers qualify as waste water?
NC-2009 WEc2:Innovative wastewater technologiesposted by Kristopher Lashley on
I am wondering if I can include a restaurant dishwasher in my waste water calculations for WEc2? According to the reference guide waste water is defined as "the spent or used water from a home, co
retail definition?
ND-Plan-v4 SLLc4:Bicycle facilitiesposted by Ian Scott on
I am curious what uses "retail" would include. Have searched for a definition but can't find one.
RE: Vanpool Parking for a Core and Shell
CS-2009 SSc4.4:Alternative transportation - parking capacityposted by Troy Glasner on
Hello, I am working on a C&S project. The minimum parking capacity set by local zoning is 165 parking spots. The project has 165 spots exactly. The project size is 86000 sq ft.
Previously Developed Buildings exemption
Homes-v4 LTp1:Floodplain avoidanceposted by Joanne Sawatzky on
What is meant by 'previously developed buildings'? We have a project where there are existing residential buildings on a site that will be demolished for new residential buildings.
CC&R
ND-Plan-v4 GIBc17:Light pollution reductionposted by William Gagnon on
Hello, Any examples of CC&Rs relative to light pollution reduction?
At the discretion of the permit holder
NC-2009 SSc4.4:Alternative transportation - parking capacityposted by Ashley Hu on
Hi Everyone, here's another question. The campus guidance from the LEED Canada Reference Guide states the following: " It is acceptable to achieve a Campus Shared Infrastructure compliance path
LEED V4 DATA CENTER
NC-2009 PIf1:Minimum Program Requirementsposted by Caroline Vallieres on
There is a new data center extension to an existing building of a different use (office). The extension is accessible via a corridor. The buildings do share an electrical box.
Adding carpet to LEED Platinum NC building
posted by Alireza Anvari on
Hi, I'm new here and new in LEED, I apologize for my ignorance. I work as a PM in a LEED Platinum NC building. We are planning to install carpet in the top floor hall way.
EQc5 - Parking Garages
NC-2009 IEQc5:Indoor chemical and pollutant source controlposted by Kristopher Lashley on
We have a multi story underground parking structure that is exhausted with 26,000cfm P1, 32,000 cfm for P2 and P3.