right of ways adjacent to project?

ND-Plan-v4 NPDc7:Transit facilities
posted by  Ian Scott  on 

Given how a project boundary is supposed to be defined, either the project side of the right of way or the far side (non-project side) of the right-of-way, for this credit how do you deal with tran

1
Mon Nov 30, 2015, 11:13 pm

Living Wall

Retail-NC-v4 WEc4:Water metering
posted by  Joanne Sawatzky  on 

We have a CI project and are targeting this as an innovation credit. There is not outside space, but there is a living wall inside.

1
Tue Jan 17, 2017, 9:17 pm

Major Renovation prerequisites

LEED Rating System Selection
posted by  Vanessa Poirier  on 

Hi all, In the case of a Major Renovation project, are all prerequisites must be answered (in all categories) or only the ones for the categories affected by the project.

1
Tue Jan 31, 2017, 4:40 pm

Credit Points

Healthcare-v4 IPc1:Integrative process
posted by  Christine Chow  on 

The Reference Guide shows 1-5 points are available for this credit under the Hospitality and Healthcare rating systems. Is it explained anywhere how the variation of points is awarded?

1
Wed Aug 30, 2017, 2:17 pm

Coat area - regularly occupied?

NC-2009 IEQc8.2:Daylight and views - views
posted by  Eric White  on 

We have an K-6 school project which is mostly views-compliant. One issue we are having in getting above 90% views requirement is the coat area at the rear of the classroom.

1
Tue Jan 20, 2015, 1:16 pm

Manufacturer Declaration Letter

NC-2009 MRc4:Recycled content
posted by  Rezkar Abdulmajeed  on 

We completed the design of our project in 2013 and start construction in 2014.

1
Mon May 4, 2015, 1:45 pm

Option 2 Meaning of "Contiguous Area"

NC-2009 IEQc3.2:Construction IAQ management plan - before occupancy
posted by  Daniel Smith  on 

Some of the air handling units at the site (police station) where I will be conducting air testing serve more than one area on a given floor, and these areas are not directly connected to each othe

1
Mon Oct 31, 2016, 2:10 pm

green roofs

NC-v4 WEp1:Outdoor water use reduction
posted by  Geoffrey Katz  on 

Hello all, Under Option 1 are vegetated (green) roofs considered as part of the landscape that requires (or does not require) a permanent irrigation system?

1
Wed Mar 29, 2017, 3:11 pm

Pre-Consumer Recycled Content

EBOM-v4 MRc1:Purchasing - ongoing
posted by  Claire Bannister  on 

How is pre-consumer recycled content calculated in v4? In v2009, there were columns for both pre- and post- consumer.

1
Tue May 30, 2017, 10:08 pm

LEED V4 DATA CENTER

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Caroline Vallieres  on 

There is a new data center extension to an existing building of a different use (office). The extension is accessible via a corridor. The buildings do share an electrical box.

1
Mon Dec 8, 2014, 6:21 pm