Forum quick links
LEED O+M: Multifamily
NC-v4 MPR3:Must comply with project size requirementsposted by Adam Stoker on
Where can I go to find information on the project size requirements for LEED O+M: Multifamily projects?
Customer Use of Restrooms
Retail-CI-v4 WEc1:Indoor water use reductionposted by Mélanie Pitre on
Working on a retail project, we have the same case as described by Donny Goris Kolb in his comment : the store's restrooms are intended for employee use, but employees are directed to grant custome
Does Revit daylight analysis satisfy CaGBC for IEQc8.1
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by ben chouinard on
Can anyone confirm if the in-house plugin for Revit 2015 will be accepted for IEQc8.1 simulation?
Sub-merters
EBOM-v4 EAp2:Minimum energy performanceposted by Ann-Judith Belanger on
Hi, we have a building that share some mechanical equipment with the adjacent building.
FTE calculation and use associated for visitors
Healthcare-v2009 WEp1:Water use reductionposted by Annabelle Lam on
I am working on a hospital project where I have both inpatients and visitors.
Is a Rollout Mat considered a permanent entryway system?
EBOM-v4 EQc2:Enhanced indoor air quality strategiesposted by Tim Nabholz on
According to the language provided for the credit: "Acceptable entryway systems include permanently installed grates, grilles, slotted systems that allow for cleaning underneath, rollout mats, and
Product Specific & Industry EPD
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Leanne Conrad on
Our project may be able to obtain this credit, but it might come down to the last half value for an industry EPD.
Empty parking spots
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by S. Macgregor on
We are installing alternative-fuel refueling stations, with preferred parking.
Requirements for recycle concrete
NC-2009 MRc4:Recycled Contentposted by Dw Barnes on
Is there a certain requirement/specification to use concrete that has been crushed from other sites as a material for another site?
Water-Related Systems Implementation Phase
CS-v4 IPc1:Integrative processposted by Tyler Young on
I love the introduction of this credit. I have a question regarding the implementation phase of the water-related systems.