Forum quick links
Occupant Comfort Survey
NC-v4 INc1:Innovationposted by Leanne Conrad on
Is there a minimum duration after occupancy you must wait to conduct the occupant comfort survey?
Option 3 flexible lighting control system required documentation
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Alara Brinton on
I'm not entirely sure what the LEED online form/template means in regards to calculations for flexible lighting control system.
Using Schools option 2 - Pedestrian Access for a Community Service Center
NC-v4 LTc4:Surrounding density and diverse usesposted by nancy picard on
Has anyone ever seen new construction projects where an exception was made for them to use Schools option 2 - Pedestrian Access even if applying for another type pf building?
Exemption of Tenant Space
NC-2009 EAp2:Minimum Energy Performanceposted by Sandra Lester on
We are working on a project that is primarily a nursing home but there is a tenant space on the ground floor that is about 15% of the building.
APPA Room Type Definitions
EBOM-2009 IEQc3.2:Green Cleaning—Custodial Effectiveness Assessmentposted by Alexis Doyle on
Hello,
LEED V4.1 EBO+M Minimum Program Requirements
posted by Ben McEwen on
I cannot verify that LEED V4.1 EBO+M requires fulfillment of the usual MPRs that have been required for previous versions (permanent location, site boundaries, etc.). V4 do
option 2 - Is Land donation acceptable as alternate?
NC-v4 SSc2:Site development - protect or restore habitatposted by Navisa Jain on
Hi,
Does land donated to a national entity for conservation qualify instead of financial support?
Systems Narrative Template
EBOM-v4.1 EAp1:Energy Efficiency Best Management Practicesposted by Ben McEwen on
Hi,
I'm wondering if I can use the same BAS System Narrative Template from V2009 for V4.1?
Thanks,
Ben