INNOVATION - PILOT CREDIT - Cooling tower water management
NC-v4 INc1:Innovationposted by Maria Peralta on
Hello,
Im wondering about this possible pilot credit.
Pilot credit EQpc44 - Ergonomist Specialist
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Maria Dolores Juri on
Hello,
Our project is pursing LEED BD+C v4 EQpc44.
I have a question regarding the ergonomic specialist hired to design an ergonomic strategy for the project.
LEED BD+C: Retail or LEED ID+C: Retail?
posted by Borja Sánchez on
Hi, I have a doubt of what rating system is more adequate for a new LEED project that we are working on.
Automatic Daylighting Controls for guest rooms (hotel) in Section 9.4.1.4
NC-2009 EAp2:Minimum Energy Performanceposted by Laia Pons on
I have a Hotel with guest rooms bigger than 23 m2, could anybody advise if all the guest rooms (enclosed spaces bigger than 23 m2) should have Automatic Daylighting Controls ?
NC-2009 SSc5.1 - Site Development—Protect or Restore Habitat - VEGETATED AREAS
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Maria Peralta on
Hello!,
I have a doubt regarding to this credit.
Is installing more than one water meter per subsystem ok?
NC-v4 WEc4:Water meteringposted by Pablo Muñoz on
The credit is not specific enough (as it is in the energy metering credit).
What could be considered as "physically accesible"?
NC-v4 SSc3:Open spaceposted by Pablo Muñoz on
Could we consider physically accesible a roof open to all tenants but without an elevator (the only way to get there is through the stairs)?