Forum quick links
The year of metering
EBOM-v4 EAp2:Minimum energy performanceposted by Vindio Corro on
Must be the year of metering after the registration of the project or can be used a year of metering of before?
Portfolio Energy Star
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Mercè Llorca on
Hello. We will make the Eap2 by Energy Star. To do this we have invoices for the total consumption of the building (offices + CPD), and manual readings consumption of different meters.
WEp1 calculator gender
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by VICTOR MORENO on
In v2009 WEp1 calculator, the toilet is divided by gender (male and female. If the % male-female is 50%-50%, it might point to 50% in "percent of occupants" cell each.
n/a
Pilot-Credits SSpc55:Bird collision deterrenceposted by Maria Rios on
Hey, We are trying to prepare all documentation to get this credit, and we are having some difficulties due to the next consideration: "Plan(s) and/or elevation(s) depicting the location of all m
LCA calculation
NC-v4 MRc1:Building life-cycle impact reductionposted by Emmanuel Pauwels on
1- When performing a LCA calculation for the envelope and structure, not all materials proposed by the design team have an EPD.
Football field
NC-2009 SSc2:Development Density and Community Connectivityposted by Instra Ingenieros on
Hi, Is correct to assume that a football field can be considered a basic service inside the category "fitness center"? Thank you in advance
Simulation. Warehouse. Fixed high racks, occupied.
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Candice Clark on
For a warehouse, can I deduct the permanently fixed high racking coverage area from the gross floor area, and focus my 75% daylight coverage on the aisles and landing spaces only? I say yes.
Volume boundary in CFD calculations
Healthcare-v2009 IEQc5:Indoor chemical and pollutant source controlposted by VICTOR MORENO on
Hi, to perform CFD model for IEQc5-LEED Healthcare. What is the size of the model boundary in exterior CFD calculations? That is to say, What area (m2) around the hospital we have to model?. Than
Alarms with CO2 sensors
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Instra Ingenieros on
hi, We have a project with non-densely spaces. The non-densely space will have CO2 sensor. VAV with 100% outdoor air will be supply the OA to these spaces.
Core & Shell without HVAC or electrical systems
CS-2009 MPR2:Must be a complete, permanent building or spaceposted by Celia Puertas Romero on
We would like to pursue LEED Core & Shell certification for a building undergoing a major renovation.